Our construction company offers a comprehensive list of projects for all types of construction needs. We specialize in custom projects, from residential to commercial. Our team of experienced professionals will work with you to ensure that your project is completed on time and within budget. We use the latest technology and materials to ensure that your project is completed to the highest standards. We also offer a variety of services, such as project management, design, and engineering.

LCC has executed and undertaken a number of projects in the states of Bihar, West Bengal, Madhya Pradesh, Karnataka and Andhra Pradesh.

Projects & Performance

s.no

Name of the work

Client/owner

Contract Amount

Period of execution

status

1

Wind Power Project

Land Procurement for 20 WTG Locations alongwith ROW near Naregal Gadag Dies, Kamataka State

Azure Power

3500 Lakhs


6 months

Work Under Progress

2

Wind Power Project

Land Procurement for 44 WTG Locations alongwith ROW for 33KV Line Works, and other Required Works at Jagahin. Davangere Dis., Karnataka State


JSW ENERGY

2100 Lakhs

8 months

Work Under Progress

3

Wind Power Project

Land Procurement for 54 WTG Locations alongwith ROW for 33KV Line Works, and other Required Works at Kudligi, Davangere Dits., Kamataka State

JSW ENERGY

2200 Lakhs

8 months

Work Under Progress

4

Wind Power Project

Land Proucrement for 27 locations along with WTG Civil Foundations, Roads, Platforms and other Required Civil Works at Koppal and Gadag Dist., Karnataka State


Renew Power Pvt Ltd

3800 Lakhs

18 Months

Work Under Progress

5

ROAD WORKS

Land Proucrement for 27 locations along with WTG Civil Foundations, Roads, Platforms and other Required Civil Works at Koppal and Gadag Dist., Karnataka State


APIIC, Govt of AP

6900 Lakhs

2019-20

Work Under Progress

6

LAND GRADING & HARD ROCK EXCAVATION

Excavation kading and Deposal of Soils Loose or dence or Hard Rock Near Tukkugada. Besides Airport, Hydrabad City. RR Dist. Telangalan State

BVM Enery and Recidency Pvt Ltd, Hyderabad

8500 lakhs

2018-20

Work Under Progress

7

NTPC-SIMHADRI, VIZAG:

Civil Works for Second Raising of Ash Dyke (Lagoon IV) for Simhadri STPS Stage-1(2500MW) at Visakhapatnam, AP

NTPC

2600 Lakhs

2019-20

Work Under Progress

8

IRRIGATION PROJECT

HNSS Project-Phase-I-Package No.33 (Balance Work) - Excavation of Balance work in Distributory Majors, Minors, Sub Minors and constructions of CM & CD works on Distributory system and Construction of Balance CM & CD works on HNSS Main Canal in the reach from Km 176.000 to Km

Water Resources Dept., Govt of AP

2500 Lakhs

2018-20

Work Under Progress

9

BUILDING PROJECT FOR DIVIS:

Construction of Industrial Buildings, Roads and other Infra works for Divis Laboratories Ltd., at Unit - 1. Divis Laborotaries, Near Choutuppal, Nalgonda Dist., Telangana State


Divis laboratories Ltd

1700 Lakhs

2018-19

Completed


10

WIND POWER PROJECT

Land Procurement for WTG C Foundations for 50 MW near Jagake Town Davangere Dist., Karnataka State

Seimens Gamesa Renwable Power Pvt Ltd

1125 Lakhs

2018-19

Completed Aug 21

11

WIND POWER PROJECT:

Land Procurement for WTG Civil Foundations and 33kv Electrical lines besides Molagavalli Village, Near Akuru Town, Civil Works for 50 MW Solar Project, for NTPC near NP Kunta Village, Anantapur Dist., AP

Dist, AP (MOLAGAVALLI PROJECT PHASE IV


Seimens Gamesa Renwable Power Pvt Ltd

650 Lakhs

2018-19

Completed on Sep 2018

12

SOLAR PROJECT:





Civil Works for 50 MW Solar Project, for NTPC near NP Kunta Village, Anantapur Dist., AP


Sterling & Wilson Solar Ltd.,

300 Lakhs

2019-20

Completed May 2019

13

SOLAR PROJECT:

Civil Works for 50 MW Solar Project, for NTPC near NP Kunta Village, Anantapur Dist., AP


Gamesa Renewable Pvt Ltd

400 Lakhs

2019-20

Completed May 2019

14

LAND GRADING WORK:

Land Grading work by cutting, Blasting and filling and levelling for KIA CAR PROJECT, near Penugonda town, Anantapur Dist, AP (JV With Associated Project)

APIIC-L & T

7200 Lakhs

2017-18

Completed on Mar 2018

15

INTPC-SIMHADRI, VIZAG:

Civil Works for Third Raising of Ash Dyke (Lagoon III) for Simhadri STPS Stage-1(2x500MW)

NTPC

2200 Lakhs

2017-18

Completed on Dec'2018

16A

WIND POWER PROJECT:

Construction of 33KV line including ROW for 25 WTG (50 MW) locations, besides Molagavalli Village, Near Guntakallu

Gamesa Renewable Pvt Ltd

850 Lakhs

2017-18

2018Completed on Sep 2018

16B

WIND POWER PROJECT:

Land Development for 25 No's (50 MW) of WTG Civil Foundations and Other Infra Works besides Molagavalli Village near Akru Town, Kurnool Dist., AP (LAND

Gamesa Renewable Pvt Ltd

1550 Lakhs

2017-18

Completed on Sep 2018

17

SOLAR PROJECT: 

Civil Works for 30 MW Solar Project, near Kogali Village. Davangere Dist. Dist. Karnataka State

Gamesa Renewable Pvt Ltd

1500 Lakhs

2017-18

Completed on Dec 2018

18

SOLAR PROJECT: 

Civil Works for 1.40 MW Solar Project, for NTPC Kudgi. Bijapur Dist., Karnataka State

Gamesa Renewable Pvt Ltd

175 Lakhs

2017-18

Completed on Mar 2018

19

WIND POWER PROJECT:

Civil Foundations for 2MW WTG Wind Turbines (25 No's) and Other Infra Works besides Bableswar Village, Near Bijapur City, Bijapur Dist., Karnataka State. (BABLESWAR PHASE- II PROJECT)

Gamesa Renewable Pvt Ltd

650 Lakhs

2017-18

Completed on Feb 2018

20A

WIND POWER PROJECT:

Land Development for 30 No's of WTG Civil Foundations and Other Infra Works besides Itnal Village, Yerragatti Town. Belgaum Dist., Karnataka State, (LAND DEVELOPMENT FOR SATTIGERI PHASE II

Gamesa Renewable Pvt Ltd

1450 Lakhs

2017-18

Completed on Feb 2018

20B

WIND POWER PROJECT:

Civil Foundations for 2MW WTG Civil Foundations (30 No's). Roads, Platforms and Other Infra Works besides Itnal Village, Yerragatti Town, Belgaum Dist., Karnataka State. (CIVIL WORKS FOR SATTIGERI PHASE II PROJECT)

Gamesa Renewable Pvt Ltd

750 Lakhs

2017-18

Completed on Feb 2018

21A

WIND POWER PROJECT:

Civil Foundations for 3 MW WTG Civil Foundations (21) No's, Platforms and Other Infra Works besides Kanmadi Village, near Bijapur Town, Karnataka State


Vestas Wind Technology India Private Limited

350 Lakhs


2017-18

Completed on Mar 2018

21B

WIND POWER PROJECT:

Civil Foundations for 2 MW WTG Civil Foundations (30 No's Road Platkoms and Other Infra Works besides Yeburga Village, near Koppal Town Karnataka State

Vestas Wind Technology India Private Limited

1650 Lakhs

2017-18

Completed on Mar 2018

22

NTPC - SIMHADRI, VISAG:

Civil Works for Il-lird Raising of Ash Dyke (Lagoon 11) for Sinthadri STPS Sta - 1 (2x500MW)

NTPC

3700 Lakhs

2016-17

Completed on Dec"2017

23

ROAD WORKS:

Site Levelling and Construction of BT Road at Capital City of AP, Amaravati

SR M University

500 Lakhs

2017-18

Completed on A ust"2017

24

WIND POWER PROJECT:

Civil Foundations for 3 M W WTG Civil Foundations (21 No's), Platforms and Other Infra Works besides Kannüldi Villa , near your Town, Karnataka State

Acciona Energy

2700 Lakhs

2016-17

Completed on July"2017

25

WIND POWER PROJECT:

Civil Foundations for 2 MW wrc, Civil Foundations (4 No's) along with Road, Platforms in Hilly Terrain besides Bangakanahalli is near Chitradurga Town, Chitradurga Dist. , Karnataka State

Ganwsa Renewable Pvt Ltd

110

2016-17

Competed on Mar"2017

26

WIND POWER PROJECT:

Civil Foundations of GE 2.30 MW Turbine W'TG Civil

Foundations, along with Road, Platfornxs in Hilly Terrain besides Bangakanahalli near Chitradurga Town, Chitradurga Dist., Karnataka State.

Atria Wind P0"er/AS

695 [Akhs

2016- 17

Competed on Mar"2017

27

WIND POWER PROJECT:

Civil Foundations ofGE 1.70 MW & 2.30 MW Turbine & Vestas 2.00 rv1W Turbines (19 No's) Civil Foundations, along with Road, Platforms in HITly Terrain besides Kandi ruear Badvel Town, Cuda ah Dist. , Andhra Pradesh State.

Ecoren Energy India Pvt Ltd

1350 Lakhs

2016- 17

Compete d on April"2017

28

WIND POWER PROJECT:

Civil Foundations for 2MW WTG Civil Foundatioms (25 No's) and Other Infi"a Works besides Bableswar Village, Near Bijapur C , Bia ur Dist., Karnataka State.

Ganwsa Renewable Pvt Ltd

850 Lakhs

2016- 17

Competed on Mar"2017

29

WIND POWER PROJECT:

Land Development Agreement for procurenrnt of 30 WTG (60 MW) locations, alongwith Road, electrical row, and other infra works besides Molagavalli, Near Aluru Town, Kurnool Dist., Andhra Pradesh

Ganwsa Renewable Pvt Ltd

1650 Lakhs

2016- 17

Competed on Mar"2017

30

WIND POWER PROJECT:

Construction of WTG Foundatims and WTG Substations 25

No's - Yelisirur wind farm Phase-Il Beside Venkatapuram

Vilkl , near Ga d Town, Gada Dist., Karnataka.

Suzlon Energy

970 Lakhs

2016- 17

Competed on April"2017

31A

POYER PROJECT:

Land Developnrnt Agreerœnt for procurenrnt of 12 WTG (24

MW) locations, besides Sattigeri Village, Near Yeragatti

Town, Be tm Dist., Karnataka State.

Gamesa Renewable PvtLtd

796

2016-17

Competed on Mar"2017

31B

WIND POWER PROJECT:

Civil Foundations for 2MW WTG Civil Foundations (30 No's), Roads, Platforms and Other Infra Works besiles Sattigeri Village, Yerragatti, Belgaum Dist., Karnataka State.

Gamesa Renewable PvtLtd

1225 Lakhs

2016-17

Competed on Mar"2017

32A

WIND POWER PROJECT:

Civi Foundations for 2MW WTG Civi Foundations (86 No's), Roads, Platforms and Other Infra Works besiles Uravakonda, Ananta ur Dist., Andhra Pradesh.

Gamesa Rene "able Pvt Ltd

3520 Lakhs

2015-17

Competed on Mar"2017

32B

POYER PROJECT:

Land DevelopflE11t Agreenrnt for procurenrnt of 71 WTG ( 142 MY) bcatioms near Uravakonda, Anantapur Dist., Andhra Pradesh.

Gamesa Rene "able Pvt Ltd

2885 Lakhs

2015-17

Competed on Mar"2017

33

MIND POYER PROJECT:

Civil Fourthtions for 1.60 WTG Foundations 15 No's), besides Betanrherla Town near Done Town, Kurnool Dist., AIKIhra Pradesh State.

Ecorn Energy India PvtLtd

300

2016-17

Competed on Sep"2016

34

POWER PROJECT:

Formation of Roads, Phonons, Laying of 2.10 MW Salon Turbine Foundations and  Infrastructure works near Theravada Town, Medak District, Telangana State

Hem Future Ltd

650 Laths

2015-16

Competed on july"2016

35

WIND POWER PROJECT:

LEMW GEWTG Foundations and WTG Saboom-30 No Reales Rabagh wind farm Phase-II Heath Hokat Villur Rahugh Town Belgaum Dist.

Bhomka Power Corporation Ltd

1880 Lakhs

2015-16

Competed on Mar" 2016

36A

WIND POWER PROJECT:


Ciu1Fourdations for 2MW WTG - 30 No's, Roads, Platfom and Other Infra Works Besides Linsugur, Raichur Dist., Kamataka State

Gamesa Wind Turbines Pvt Ltd

1200 Lakhs

2015-16

Competed on Nov" 2015

36B

WIND POWER PROJECT:

Land Development Agreement for the Provision of 30 WTG locations (60 MW) near Linsugur, Raichur Dist., Karnataka

Gamesa Wind Turbines Pvt Ltd

1200 Lakhs

2015-16

Competed on Oct"2015

37

WIND POWER PROJECT:

Construction of WTG Foundations and WTG Substati)lö 25 No's - Yelisirur wind Farm Phase-II, Beside Venkatapuram Vila , near C, Town, Gada Dist., Karnataka.

Bhomka Power Corporation Ltd

1557.151akhs

2014-15

Competed on Sep. 2015

38

WIND POWER PROJECT:

Civil Foundations tor 2MW WTG, Roads, Platforllö and Other Infra Works Besiles Tuppakloddi Village, Near Kowtal Village, Raichur Dist., Karnatak

Gamesa Wind Turbines Pvt Ltd

850 Lakhs

2014-15

Competed on March '15

39

NTPC - VISAG:

Balance work of Lagoons 3 and 4 (Above 5.5 M and OFL) Ash ke Packa for Sinthadri State-Il

NIPC Ltd.

1698.99 lakhs

2014-15

40

AP IRRIGATION PROJECTS:

Major 11Tigation: Modernization of G. WDelta systenv Undi Canal and channel system from Km 21.192 to Km 54.10 & Km 31.986 to Km44.562 near Pippare

AP Irrigation

Department

1897 lakhs

2013-14

41

AP IRRIGATION PROJECTS:

Modernisation of Kattelair Anicut Gangadevipadu for Irrigation ear Kattleru Village,

AP Irrigation

Department


2085.75

2013-14

42

NTPC - VISAG

Balance work of Lagoon 3 and 4 (Below 5.5 M and OFL) Ash Dyke Package for Simhadri State-II

NTPC Ltd. Vizag

2469.99

2013-142013-14

43

NTPC-KEHALGOAN:

Construction of4th Raising of Ash Dyke Lagoon-2 at NTPC.

NTPC Kahalgaon

1361.73

2013-14

44

NTPC-VISAG:

Balance Civil works for Staner Dykes of Stage-2 (Bebw5.5RL) NTPC, Sinthadri Viza

NTPC Ltd. Vizag

2469.00

2013-14

45

NTPC-KEHALGOAN:

NTPC KEHALGOAN: Construction of 2nd raising of Ash Dyke Lagoon-3C at Kahalgaon

NTPC Kahalgaon

911.98 Lakhs

2013-14

46

NTPC FARAKKA:

Constraction of Ind Raising of Lagoon 1. Kendus Ash Dyke of NTPC FARAKKA

NTPC Ltd. Farakka

652.43

2013-14

47

NIPC

1st Raising of Makuncha Ash Dyke Lagoon-2 at NTPC kd,Farakka

NTPC Ltd.

946.96 Lakhs

2013-14

48

NTPC • KEHALGOAN:

Construction of 2nd Raising of Ash Dyke Lagoon-3 AB at KhSTPP NTPC, Kahalgaon

NTPC Ltd.

946.96 Lakhs

2013-14

49

NTPC • KEHALGOAN:

Construction of 2nd raising of Lagoon-1 at NTPC Simhadri, Vizag


NTPC Vizag

1486.55

2013-14

50

NMDC-Bellari

Civil works of for 723 DHC Conveyor for Downhill Conveyor System of Kumasraswamy Iron Ore Project of NMDC Ltd., Package II at Donimalai, Bellary Dist., Karnataka State

Elecon EPC Pojects Ltd.

1266.861 lakhs

2013-14

51

WIND POWER PROJECT:

Cvd Works for WTC Foundation & Substations at Rayabag windfarm Belgaum Dist, Karnataka

Bhoruka Powe Co ration Ltd

746.00 Lakhs

2013-14

52

AP IRRIGATION PROJECTS:

Fart work excation of Link Canal 2 from Disli Baling Tore 2 from Km0.000 to Km1450

AP irrigation department

956.40 Lakhs

2012-13

53

AP IRRIGATION PROJECTS:

Modenization of the Godava Delta System - Bank Canal and Its Disutory System from 44.800 KM to 58,00 KM near

Sidhantam Village, West Godava District, Andhra Pradesh

AP irrigation department

1735 Lakhs

2012-13

54

Wind POWER PROJECT:

Fornution of Roads, Phtfoms, Laying of I .80 MW Turblne Fourthtions other infrastructure development works besides Konutlkuntla Vilhge, near Tadipatli Town, Anantapur District, Andhra Pradesh

Leitner Sliram Manifactuñng Ltd (ISML) and Vaata Ltd

971 Lakhs

2012-13

55

WIND POWER PROJECT:

Project Approval Facilitation for Hmpanahalli Wind Power Project, (Hara-Il) Davangere Distrit, Karnataka State

Vestas Wild Technlogy India Plivate Limited

330 Lakhs

2012-13

56

NTPC • KEHALGOAN:

Removal of Overburden works at Wagon Tippler Area at NTPC, Kahalgaon

NTPC Ltd. Kahalgaon

74.19 Lakhs

2012-13

57

NTPC • KEHALGOAN:

Removal of Overbanden works at Wagon Tippler Area a NTPC Kab

NTPC Ltd, Kahalgoan

1416.84

2011-12

58

Wind POWER PROJECT:

Project Approval Fecilitation Agreement for Benekanahalli Wind Power Project, Davangere District, Karnataka State

Vestas

Technology India Private Linited

370 Lakhs

2011-12

59

NTPC-KEHALGOAN:

Construction of First Raising of Ash Dyke Lagoon at 3C Work at NTPC, Kehalgoan, Bihar State, through NTPC Limited.

NTPCLtd, Kahalgoan, Bihar State

1050 lakhs

2011-12

60

KARNATAKA HOUSING BOARD:

Proposed Development of Sites and Services work under Suryanagar Phase III near Jigada Villege, Anekal Talkıq, Bangalore rural Dist.,

Kamataka Housing (KHB), Kamataka

4530 lakhs

2011-12

61

KARNATAKA HOUSING BOAR:

Proposed Development of Sites and Services work under Suryanagar Phase II (Extention) near Hinnakki Villege, Anekal Taluq, Bangalore rural Dist., Bangalore, Karnataka State


Karnataka Housing

Board (KHB),

Karnataka

120 Lakhs

2011-12

62

WIND POWER PROJECT:

Formation of Roads, Platforms, Laying of Civil Foundations and other Infrastructure development works near Shiragoan Village, Near Chikkodi Town, Chikkodi Taluq, Belgaum Dist., Karnataka State

Gamesa Wind Turbines Pvt Ltd 

 410 Lakhs

2011-12

63

KARNATAKA HOUSING BOARD:

Construction of Housing under "ASHERE SCHEME" near Ilkal Town, Ilkal Taluq, Bagalkot Dist., Karnataka State

Karnataka Housing Board (KHB), Karnataka

 675 Lakhs

2011-12

64

WIND POWER PROJECT:

Formation of Roads for Mobilization of Machineryfor your Wind Power Project at Bheemasamudra Village, Davangere Dist., Karnataka

NSL Renewable Power Pvt Ltd

  44 Lakhs

2010-11

65

HYDEL POWER PROJECT:

Construction of Roadway from Rispa Village to Moongual Village, Himachal Pradesh State

Generation Pvt Ltd

NSL Tidong Power

 450 Lakhs 

 2010-11

66

WIND POWER PROJECT:

Construction Roads for mobilization of Heavy Machinery at Phoolwadi village. Tamilnadu 

NSL Wind Power Company (Phoolwadi) Pvt Ltd 

168 Lakhs 

 2010-11

67

NTPC - KEHALGOAN:

Construction of 1st Raising of Ash Dyke Lagoon at 3A and 3B Work at KHSTPP NTPC, Kehalgoan, Bihar State

NTPC Ltd., Kahalgoan, Bihar State

1400 Lakhs

2010-11

68

WIND POWER PROJECT:

Laying of HT and LT Cable and other Infrastructure

Acciona Energy India development works near Tuppadahalli Villege, Chennagiri Taluq,Davangere Dist, Karnataka State

Acciona Energy India Pvt Ltd - Elect

Systems (ESEPL)

55 Lakhs

2010-11

69

WIND POWER PROJECT:

Formation of Roads and Platforms and other Infrastructure Vestas Wind development works near Tuppadahalli Villege, Chennagiri Taluq, Technology India Davangere Dist, Karnataka State

Vestas Wind Technology India Private Limited

950 Lakhs

2010-11

70

KARNATAKA HOUSING BOARD:

Proposed Development of Sites and Services work under Suryanagar Phase II near Hinnakki Villege, Anekal Taluq, Bangalore rural Dist., Bangalore, Karnataka State

Karnataka Housing

Board (KHB),

Karnataka

1850 Lakhs

2010-11

71

KARNATAKA HOUSING BOARD:

Construction of Housing under "ASHERE SCHEME" near Ganjyal Villege, Unugondu Taluq, Bagalkot Dist., Karnataka State

Karnataka Housing Board (KHB), Karnataka 

165 Lakhs 

2010-11

72

WIND POWER PROJECT:

Formation of Roads and Platforms and other Infrastructure development works under Project Hara - I, near Arkanal Tanda Technology India

Vestas Wind Villege, Harapanahalli Taluq, Davangere Dist, Karnataka State Private Limited 

765 Lakhs 

 2010-11

73

WIND POWER PROJECT:

Formation of Roads, Platforms and Laying of Foundations work near Chitradurga, Karnataka State

Chirnjeevi Wind Energy Ltd (CWEL) 

50 Lakhs

2010-11

74

NPCC PROJECT:

Construction of IInd Raising of Ash Dyke Lagoon II Work for NPCC, Kehalgoan, Bihar State

NPCC Limited- Kehalgoan 

145 Lakhs

2009-10

75

WIND POWER PROJECT:

Constuction of Roads and other Infrastructure Work near Nagapatnam, Taminadu State 

NSL Renewable Power Pvt Ltd

280 Lakhs

 2009-10

76

WIND POWER PROJECT:

Formation of Roads and Platforms and other Infrastructure development works near Bhimasamudra Village, Chitradurga Dist, Karnataka State

 Nuziveedu Seeds Limited (NSL)

1300 Lakhs

2009-10

77

ROAD WORKS:

Construction of Rural Roads undeer MP - PMJSY at Bharwani PMJSY-Madhya Dist., Madhya Pradesh State.

PMJSY-Madhya Pradesh


2950 Lakhs

2008-11

78

NTPC-KEHALGOAN:

Construction of Civil Works in Wagon tippler Complex for Coal Handling system throgh Elecon Engineering Company Ltd.

NTPC-Kehalgoan

1800 Lakhs

2008-11

79

THERMAL POWR PROJECT AT ANDAL, WEST

BENGAL:

Site Grading Work @ Coal handling Plant area for Durgapur Steel Thermal Power Corporation near Andal, Burdwan District, West Bengal State

DVC/Thysen Krupp- Coastal Projects

1600 Lakhs

2008-10

 80

WIND POWER PROJECT:

Formation of Roads, and Platforms and other Infrastructure development works near Telagi Village, Davangere Dist.

Karnataka State Vestas Wind Technology India Private Limited 

580 Lakhs

2008-09

81

AP IRRIGATION PROJECTS:

Structural Fabrication Works for Velugonda Tunnel-II Package for Irrigation and CAD Dept at Domal, Prakasam Dist. Through HCC-CPL Domal Andhra Pradesh

AP Irrigation Dept.

750 Lakhs 

2007-08

82

AP IRRIGATION PROJECTS:

Structural Fabrication Works for Velugonda Tunnel-I Package at Domala Prakasam Dist., through SEW, PRASAD, SABIR AND NSC CONSORTIUM., AP

AP Irrigation Dept.

600 Lakhs

2007-08

83

AP IRRIGATION PROJECTS:

Pula Subbaiah Velugonda Tunnel - II Package for Irrigation and CAD Dept.,, Prakasam Dist., Through HCC-CPL @ Dornala.AP

AP Irrigation Dept.

1210 Lakhs

2007-08

84

WIND POWER PROJECT:

Development of Roads, Platforms and other Infrastructure Development works under project "VAAYU" near Bharmasagara village, Davam gere District and near Anaburu

village, Jagalore Taluq, Devanagere Dist.

Vestas Wind Technology India Private Limited

400 Lakhs

2007-08

85

WIND POWER PROJECT:

Construction of Platforms (Phase-II) Hirakandavadi Village, Chitradurga Dist., Karnataka StateConstruction of Platforms (Phase-II) Hirakandavadi Village, Chitradurga Dist., Karnataka State

Nuziveedu Seeds Limited (NSL)

60 Lakhs

2007-08

86

IT PARK:

Divyasree NSL Infrastructure @ Tech Place, Rayadurgam-Site Divyasree/Nuziveedu Development Works etc.

Hyderabad. Seeds Limited (NSL)

4800 Lakhs 

2006-09

87

AP IRRIGATION PROJECTS:

Open Excavation work for construction of Ramp to reach Portal Point at outlet of Srisailam Left Bank Tunnel scheme of ALIMINETI MADHAVA REDDY PROJECT (AMRP), at Devarakonda, Nalgonda Dist., A.P

Coastal Projects Pvt. Ltd.

255 Lakhs

2006-07

88

AP IRRIGATION PROJECTS:

Pula Subbaiah Velugonda Tunnel- I Project - Package near Domala, Prakasam Dist., Through SEW, PRASAD, SABIR and NSC CONSORTIUM., AP

AP Irrigation Dept.

1230 Lakhs

2006-07

89

WIND POWER PROJECT:

Formation of Roads and Platforms and other Infrastructure development works near Chikkodi, Belgaum Dist., Kamataka State and Phase II near Arisanagundi Village, Jagalore Taluq, Davangere Dist., Karnataka State 

Vestas Wind Technology India Private Limited 

70 Lakhs 

2006-07

90

AP IRRIGATION PROJECTS:

Execution of High Level Left Main Canal Distribution System under package - 14 of BIMA LIFT IRRIGATION PROJECT, including construction of CMCD WORKS UNDER EPC to feed an ayacut of 35,800 acres, Under Sangambanda Balancing Reservoir -Survey & Execution of work.

AP Irrigation Dept.

2500 Lakhs

2005-08

91

WIND POWER PROJECT:

Formation of Roads and Platforms and other infrastructure development work near Arisanagundi Village, Jagalore Taluq, Davangere Dist., Karnataka State

Neg-Micon India Pvt, Ltd.

216 Lakhs

2005-06

Our Performance in Green Energy Projects

s.NO

nAME OF THE WORK

cLIENT/OWNER

cONTRACT aMOUNT

pERIOD OF eXECUTION

sTATUS

1

WIND POWER PROJECT:

Land Procurement for WTG Civil Foundations for 50 MW near Jagaluru Town, Davangere Dist., Karnataka State

Seimens Gamesa Renwable Power Pvt Ltd 

 1125 Lakhs

2018-19

Work Under Progress

2

WIND POWER PROJECT:

Land Procurement for WTG Civil Foundations and 33kv Electrical lines besides Molagavalli Village, Near Aluru Town, Kurnool Dist., AP (MOLAGAVALLI PROJECT PHASE

Seimens Gamesa Renwable Power Pvt Ltd 

650 Lakhs

2018-19

Completed on

Sep'2019

3

SOLAR PROJECT: 

Civil Works for 50 MW Solar Project, for NTPC near NP Kunta Village, Anantapur Dist. AP

Sterling & Wilson Solar Ltd.

300 Lakhs

2019-20

Completed on May 2019

4

SOLAR PROJECT: 

Civil Works for 50 MW Solar Project, for NTPC near NP Kunta Village, Anantapur Dist., AP 

Gamesa Renewable Pvt Ltd 

400 Lakhs

2019-20 

 Completed on May 2019

5

WIND POWER PROJECT:

Construction of 33KV line including ROW for 25 WTG (50MW) locations, besides Molagavalli Village, Near Guntakallu Town, Kurnool Dist., AP State (CIVIL WORKS FOR MOLAGAVALLI PHASE II & III)

Gamesa Renewable Pvt Ltd

850 Lakhs

2017-18

Completed on Sep" 2018

6

WIND POWER PROJECT:

Land Development for 15 No's (50 MW) of WTG Civil Foundations and Other Infra Works besides Molagavalli Village near Aluru Town, Kurnool Dist., AP (LAND DEVELOPMENT FOR MOLAGAVALLI PHASE II & lll)

Gamesa Renewable Pvt Ltd

950 Lakhs

2017-18

Completed on Sep" 2018

7

SOLAR PROJECT:

Civil Works for 30 MW Solar Project, near Kogali Village. Davangere Dist., Dist., Karnataka State

Gamesa Renewable

Pvt Ltd

1500 Lakhs

2017-18

Completed on

Dec'2018

8

SOLAR PROJECT:

Civil Works for 1.40 MW Solar Project, for NTPC Kudgi, Bijapur Dist., Karnataka State

Gamesa Renewable

Pvt Ltd

175 Lakhs

2017-18

Completed on

Mar'2018

9

WIND POWER PROJECT:

Civil Foundations for 2MW WTG Wind Turbines (25 No's) and Other Infra Works besides Bableswar Village, Near Bijapur City, Bijapur Dist., Karnataka State. (BABLESWAR PHASE- II PROJECT)

Gamesa Renewable

Pvt Ltd

650 Lakhs

2017-18

Completed on

Feb 2018

10

WIND POWER PROJECT:

Land Development for 30 No's of WTG Civil Foundations and Other Infra Works besides Itnal Village, Yerragatti Town, Belgaum Dist., Karnataka State. (LAND DEVELOPMENT FOR SATTIGERI PHASE II)

Gamesa Renewable

Pvt Ltd

1450 Lakhs

2017-18

Completed on

Feb 2018

11

WIND POWER PROJECT:

Civil Foundations for 2MW WTG Civil Foundations (30 No's). Roads, Platforms and Other Infra Works besides Itnal Village, Yerragatti Town, Belgaum Dist., Karnataka State. (CIVIL WORKS FOR SATTIGERI PHASE II PROJECT)

Gamesa Renewable

Pvt Ltd

750 Lakhs

2017-18

Completed on

Feb 2018

12

WIND POWER PROJECT:

Land Development for 5 No's of WTG Civil Foundations and other Infra Works besides Taralakatti Village and Yelburga Villages near Koppal Town, Karnataka State

Vestas Wind

Technology India

Private Limited

350 Lakhs

2017-18

Completed on

Mar 2018

13

WIND POWER PROJECT:

Civil Foundations for 2 MW WTG Civil Foundations (30 No's), Road, Platforms and Other Infra Works besides Yelburga Village, near Koppal Town, Karnataka State

Vestas Wind

Technology India

Private Limited

1650 Lakhs

2017-18

Completed on

Mar 2018

14

WIND POWER PROJECT:

Civil Foundations for 3 MW WTG Civil Foundations (21 No's), Platforms and Other Infra Works besides Kanmadi Village, near Bijapur Town, Karnataka State

Acciona Energy

2700 Lakhs 

2016-17 

Completed

on July 2017

15

WIND POWER PROJECT:

Civil Foundations for 2 MW WTG Civil Foundations (4 No's) along with Road, Platforms in Hilly Terrain besides Bangakanahalli near Chitradurga Town, Chitradurga Dist.. Karnataka State

Gamesa Renewable Pvt Ltd 

110 Lakhs

2016-17 

Completed on

Mar 2018

16

WIND POWER PROJECT:

Civil Foundations of GE 2.30 MW Turbine WTG Civil Foundations, along with Road, Platforms in Hilly Terrain besides Atria Wind Power/AS Bangakanahalli near Chitradurga Town, Chitradurga Dist.. Karnataka State

Atria Wind Power/AS Infra

695 Lakhs

2016-17 

Competed on Mar 2017

17

WIND POWER PROJECT:

Civil Foundations of GE 1.70 MW & 2.30 MW Turbine & Vestas 2.00 MW Turbines (19 No's) Civil Foundations, along with Road. Platforms in Hilly Terrain besides Kandi near Badvel Town. Cudappah Dist., Andhra Pradesh State

Ecoren Energy India Pvt Ltd

1350 Lakhs

2016-17 

Competed on April 2017

18

WIND POWER PROJECT:

Civil Foundations for 2MW WTG Civil Foundations (25 No's) and Other Infra Works besides Bableswar Village, Near Bijapur City, Bijapur Dist., Karnataka State.

Gamesa Renewable Pvt Ltd

850 Lakhs

2016-17 

Competed on Mar 2017

19

WIND POWER PROJECT:

Land Development Agreement for procurement of 30 WTG (60 MW) locations, alongwith Road, Platforms, Electrical Row and other infra works besides Molagavalli, Near Aluru Town, Kurnool Dist. Andhra Pradesh

Gamesa Renewable Pvt Ltd

1650 Lakhs

2016-17 

Competed on Mar 2017

20

WIND POWER PROJECT:

Civil Foundation of 2.10 MW Suzlon Turbine Foundations (25 No's) and other Infrastructure development works near Koukuntla Village, Uravakonda Mandal, Anatapur Dist., AP 

Suzlon Energy 

970 Lakhs

2016-17

Competed on April 2017

21

WIND POWER PROJECT:

Land Development Agreement for procurement of 12 WTG (24 MW) locations, besides Santigeri Village, Near Yerragatti Town, Belgaum Dist., Karnataka State

Gamesa Renewable Pvt Ltd

796 Lakhs

2016-17

Competed on Mar'2017

22

WIND POWER PROJECT:

Civil Foundations for 2MW WTG Civil Foundations (30 No's) Roads, Platforms and Other Infra Works besides Sattigeri Village. Yerragatti Town, Belgaum Dist., Karnataka State.

Gamesa Renewable Pvt Ltd

1225 Lakhs

2016-17

Competed on Mar'2017

23

WIND POWER PROJECT:

Civil Foundations for 2MW WTG Civil Foundations (86 No's), Roads, Platforms and Other Infra Works besides Uravakonda, Anantapur Dist., Andhra Pradesh

Gamesa Renewable Pvt Ltd

3520 Lakhs

2016-17

Competed on Mar'2017

24

WIND POWER PROJECT:

Land Development Agreement for procurement of 71 WTG (142 MW) locations near Uravakonda, Anantapur Dist., Andhra Pradesh

Gamesa Renewable Pvt Ltd

2885 Lakhs

2016-17

Competed on Mar'2017

25

WIND POWER PROJECT:

Civil Foundations for 1.60 MW WTG Civil Foundations 15 No's), besides Betamcherla Town near Done Town, Kurnool Dist., Andhra Pradesh State

Ecoren Energy India Pvt Ltd

300 Lakhs

2016-17

Completed on Sep" 2016

26

WIND POWER PROJECT:

Formation of Roads, Platforms, Laying of 2.10 MW Suzlon Turbine Foundations and other Infrastructure development works near Zaheerabad Town, Medak District, Telangana State

Hero Future Energy Ltd

650 Lakhs

2015-16

Completed on July "2016

27

WIND POWER PROJECT:

Construction of 1.8 MW GE WTG Foundations and WTG Substations-30 No's Besides Raibagh wind farm Phase-II Beside Bykud Village, near RaibaghTown, Belgaum Dist., Karnataka State

Bhoruka Powe Corporation Ltd 

1880 Lakhs

2015-16 

Completed on Mar" 2016

28

WIND POWER PROJECT:

Civil Foundations for 2MW WTG-30 No's, Roads, Platforms and Other Infra Works Besides Linsugur, Raichur Dist.

Gamesa Wind Turbines Pvt Ltd

1200 Lakhs

2015-16 

Completed on Nov" 2015

29

WIND POWER PROJECT:

Land Development Agreement for procurement of 30 WTG locations (60 MW) near Linsugur. Raichur Dist., Karnataka

Gamesa Wind Turbines Pvt Ltd

1200 Lakhs

2015-16

 Completed on Oct 2015

30

WIND POWER PROJECT:

Construction of WTG Foundations and WTG Substations 25 No's - Yelisirur wind farm Phase-II Beside Venkatapuram Village, near Gagad Town. Gadag Dist.. Karnataka

Bhoruka Powe Corporation Ltd

1557.15 Lakhs 

2014-15

Completed on Sep" 2015

31

WIND POWER PROJECT:

Civil Foundations for 2MW WTG, Roads, Platforms and Other Infra Works Besides Tuppakloddi Village, Near Kowtal Village, Raichur Dist., Karnataka

Gamesa Wind Turbines Pvt Ltd

850 Lakhs

2014-15

Completed on March '15

32

WIND POWER PROJECT:

Civil Works for WTC Foundation & Substations at Rayabag windfarm, Belgaum Dist, Karnataka

Bhoruka Powe Corporation Ltd

746.00 Lakhs

2013-14

Completed

33

WIND POWER PROJECT:

Formation of Roads, Platforms, Laying of 1.80 MW Turbine Foundations and other Infrastructure development works besides Komatikuntla Village, near Tadipatri Town, Anantapur District, Andhra Pradesh

Leitner Sriram Manufacturing Ltd (LSML) and Vaata Infra Pvt Ltd

971 Lakhs

2012-13

Completed

34

WIND POWER PROJECT:

Project Approval Fecilitation for Harpanahalli Wind Power Project, (Hara-II) Davangere District, Karnataka State

Vestas Wind Technology India Private Limited

330 Lakhs

2012-13

Completed

35

WIND POWER PROJECT:

Project Approval Fecilitation Agreement for Benekanahalli Wind Power Project, Davangere District, Karnataka State

Vestas Wind Technology India Private Limited

370 Lakhs

2011-12

Completed

36

WIND POWER PROJECT:

Land Procurement for 30 locations of 850KV Turbine Erection near Shiragoan Village, Near Chikkodi Town, Chikkodi Taluq, Belgaum Dist., Karnataka State

Gamesa Wind Turbines Pvt Ltd

450 Lakhs

2011-12

Completed

37

WIND POWER PROJECT:

Formation of Roads, Platforms, Laying of Civil Foundations and other Infrastructure development works near Shiragoan Village, Near Chikkodi Town, Chikkodi Taluq, Belgaum Dist.,

Karnataka State

Gamesa Wind Turbines Pvt Ltd

410 Lakhs

2011-12

Completed

38

WIND POWER PROJECT:

Formation of Roads for Mobilization of Machineryfor your Wind Power Project at Bheemasamudra Village, Davangere Dist.Karnataka

NSL Renewable Power Pvt Ltd

44 Lakhs

2010-11

Completed

39

WIND POWER PROJECT:

Construction Roads for mobilization of Heavy Machinery at Phoolwadi village, Tamilnadu

NSL Wind Power Company (Phoolwadi) Pvt Ltd

168 Lakhs

2010-11

Completed

40

WIND POWER PROJECT:

Laying of HT and LT Cable and other Infrastructure development works near Tuppadahalli Villege, Chennagiri Taluq, Davangere Dist, Karnataka State

Acciona Energy India Pvt Ltd - Elect Systems (ESEPL)

55 Lakhs

2010-11

Completed

41

WIND POWER PROJECT:

Formation of Roads and Platforms and other Infrastructure development works near Tuppadahalli Villege, Chennagiri Taluq, Davangere Dist, Karnataka State

Vestas Wind Technology India Private Limited

950 Lakhs

2010-11

Completed

42

WIND POWER PROJECT:

Formation of Roads and Platforms and other Infrastructure development works under Project Hara - 1, near Arkanal Tanda Villege, Harapanahalli Taluq, Davangere Dist, Karnataka State

Vestas Wind Technology India Private Limited

765 Lakhs

2010-11

Completed

43

WIND POWER PROJECT:

Formation of Roads, Platforms and Laying of Foundations work

near Chitradurga, Karnataka State

Chirnjeevi Wind Energy Ltd (CWEL)

50 Lakhs

2010-11

Completed

44

WIND POWER PROJECT:

Constuction of Roads and other Infrastructure Work near Nagapatnam, Taminadu State

NSL Renewable Power Pvt Ltd

280 Lakhs

2009-10

Completed

45

WIND POWER PROJECT:

Formation of Roads and Platforms and other Infrastructure development works near Bhimasamudra Village, Chitradurga

Dist. Karnataka State

Nuziveedu Seeds Limited (NSL)

1300 Lakhs

2009-10

Completed

46

WIND POWER PROJECT:

Formation of Roads, and Platforms and other Infrastructure development works near Telagi Village, Davangere Dist. Karnataka State

Vestas Wind Technology India Private Limited

580 Lakhs

2008-09

Completed

47

WIND POWER PROJECT:

Development of Roads, Platforms and other Infrastructure Development works - under project "VAAYU" near Bharmasagara village, Davam gere District and near Anaburu village. Jagalore Taluq, Devanagere Dist.,

Vestas Wind Technology India Private Limited

400 Lakhs

2007-08

Completed

48

WIND POWER PROJECT:

Construction of Platforms (Phase-II) Hirakandavadi Village, Chitradurga Dist., Karnataka State

Nuziveedu Seeds Limited (NSL)

60 Lakhs

2007-08

Completed

49

WIND POWER PROJECT:

Formation of Roads and Platforms and other Infrastructure development works near Chikkodi, Belgaum Dist., Kamataka State and Phase II near Arisanagundi Village, Jagalore Taluq, Davangere Dist., Karnataka State

Vestas Wind Technology India Private Limited

70 Lakhs

2006-07

Completed

50

WIND POWER PROJECT:

Formation of Roads and Platforms and other infrastructure development work near Arisanagundi Village, Jagalore Taluq, Davangere Dist., Karnataka State

NEG-Micon India Pvt., Ltd.,

216 Lakhs

2005-06

Completed

SOME OF OUR WORK EXPERIENCES DURING LAST 5 YEARS

s.no Project Client/Owner Value of Work in Cr Period Status
1
Procurement of Land for 29 locations near kustagi, Koppal Dist., Karnataka
BVM Energy private limited
1110 Lakhs
2018-2020
"Work In Progress (90% completed, Work Enhanced)"
"Excvation, Loading and Disposal of Hard Rock by means of controlled balasting and chesiling by mechanical means at Shamshabad, Telangana"
2
Pharma Buildings & Warehouses
Divis Labouratories Limited
25.00
2018-2020
Work in progress
"Construction of Pharma Structures, RM & Engg Warehouses, SEZ Office, Pipline Bridge, CC Roads & other Infrasturctural Works for SEZ at Choutuppal, Telangana"
3
Construction of raising of Ash Dyke
NTPC Simhadri/SIPL
26.00
2019-2020
work in progress
"Construction of Raising of Ash Dyke Lagoon -4 at NTPC Simhadri -VIZAG"
4
Site Grading, Roads, Culverts, Retailning Wall And Infrastructural Works
APIIC / RK Infra Corp
62.00
2019-2020
work in progress
"Creation of Internal Infrastructure, like Roads, Storm Water Drains, Retaining walls, Water Supply distribution network etc… for KIA ancillary units at APIIC, IP Gudipalli, Ananthapur Dist, Andhra Pradesh"
5
AP IRRIGATION CANAL WORK
AP IRRIGATION DEPT / SSLCC
22.00
2018-2020
work in progress
"Execution of Distributory, Major, Minors and sub minors and Construction of CM & CD works on HNSS main Canal Pkg -33 at Uravakonda, Ananthapur Dist, Andhra Pradesh"
6
WIND POWER PROJECT:
Seimens Gamesa Renwable Power Pvt Ltd
12
2018 - 19
Work in Progress
"Land Procurement for WTG Civil Foundations for 50 MW near Jagaluru Town, Davangere Dist., Karnataka State"
7
Pile foundation work
Mata Amritanandamayi Engg Institution
3.89
2018-2019
Completed
Construction of Pile foundations for instutional buildings part-I,at amaravathi campus of Amritha (vishwa Vidyapeetam) university A.P
8
SITE GRADING & LAND DEVELOPMENT
Ascendas Singbridge
41.40
2018-2019
Completed
"Site Grading and Land development for Ascendas Singbridge for Welcome Gallery at Amaravathi, Vijayawda"
9
Solar Project
Simens Gamesa Renewable Pvt Ltd
6.00
2017-2018
Completed
"Civil works for 30 MW Solar project beside Kogali Village, Near Kotturu town , Davuangree Dist, Karnataka State"
10
SITE GRADING & LAND DEVELOPMENT
SRM UNIVERSITY
5.00
2017-2018
Completed
Site grading and construction of BT Road at AMARAVATHI, ANDHRAPRADESH
11
SITE GRADING & LAND DEVELOPMENT
APIIC /L&T/API
47.00
2017-2019
Completed
"Site Grading work by means of Cutting, Blasting, Breaking, Filling and Leveling (Hard Rock - 13.00 Lakhs Cum) for KIA motors Project Penukonda , Ananthapuram Dist, Andhra Pradesh"
12
SOLAR PROJECT:
Sterling & Wilson Solar Ltd.,
5.00
2019 - 20
"Completed on May'2019"
Civil Works for 50 MW Solar Project, for NTPC near NP Kunta Village, Anantapur Dist., AP
13
SOLAR PROJECT:
Gamesa Renewable Pvt Ltd
4.50
2019 - 20
Completed on May'2019
"Civil Works for 50 MW Solar Project, for NTPC near NP Kunta Village, Anantapur Dist., AP"
14
WIND POWER PROJECT:
"Seimens Gamesa Renwable Power Pvt Ltd"
16
2018 - 19
"Completed on Dec'2019"
"Land Procurement for WTG Civil Foundations and 33kv Electrical lines besides Molagavalli Village, Near Aluru Town, Kurnool Dist., AP (Molagavalli Phase II, III & IV)"
15
SOLAR PROJECT:
Gamesa Renewable Pvt Ltd
15.00
2017 - 18
"Completed on Dec'2018"
"Civil Works for 30 MW Solar Project, near Kogali Village, Davangere Dist., Dist., Karnataka State"
16
SOLAR PROJECT:
Gamesa Renewable Pvt Ltd
2.00
2017 - 18
"Completed on Mar'2018"
"Civil Works for 1.40 MW Solar Project, for NTPC Kudgi, Bijapur Dist., Karnataka State"
17
WIND POWER PROJECT:
Gamesa Renewable Pvt Ltd
7.00
2017 - 18
"Completed on Feb'2018"
"Civil Foundations for 2MW WTG Wind Turbines (25 No's) and Other Infra Works besides Bableswar Village, Near Bijapur City, Bijapur Dist., Karnataka State. (BABLESWAR PHASE - II PROJECT)"
18
WIND POWER PROJECT:
Gamesa Renewable Pvt Ltd
24.00
2017-18
"Completed on Feb'2018"
"Land Development, Civil Foundations for 2MW WTG Civil Foundations (30 No's), Roads, Platforms and Other Infra Works besides Itnal Village, Yerragatti Town, Belgaum Dist., Karnataka State. ( SATTIGERI PHASE II PROJECT)"
19
WIND POWER PROJECT:
Vestas Wind Technology India Private Limited
22.50
2017-18
Completed on Mar'2018
"Land Development, Civil Foundations for 2 MW WTG Civil Foundations (30 No's), Road, Platforms and Other Infra Works besides Yelburga Village, near Koppal Town, Karnataka State"
20
WIND POWER PROJECT:
Acciona Energy
27.00
2016-17
"Completed on July""2017"
Civil Foundations for 3 MW WTG Civil Foundations (21 No's), Platforms and Other Infra Works besides Kanmadi Village, near Bijapur Town, Karnataka State
21
WIND POWER PROJECT:
Gamesa Renewable Pvt Ltd
1.10
2016-17
Competed on Mar"2017
"Civil Foundations for 2 MW WTG Civil Foundations (4 No's) along with Road, Platforms in Hilly Terrain besides Bangakanahalli near Chitradurga Town, Chitradurga Dist., Karnataka State"
22
WIND POWER PROJECT:
Atria Wind Power/AS Infra
7.00
2016-17
"Competed on Mar""2017"
"Civil Foundations of GE 2.30 MW Turbine WTG Civil Foundations, along with Road, Platforms in Hilly Terrain besides Bangakanahalli near Chitradurga Town, Chitradurga Dist., Karnataka State"
23
WIND POWER PROJECT:
Ecoren Energy India Pvt Ltd
16.50
2016-17
"Competed on April""2017"
"Civil Foundations of GE 1.70 MW & 2.30 MW Turbine & Vestas 2.00 MW Turbines (19 No's) Civil Foundations, along with Road, Platforms in Hilly Terrain besides Kandi near Badvel Town, Cudappah Dist., Andhra Pradesh State"
24
WIND POWER PROJECT:
Gamesa Renewable Pvt Ltd
8.5
2016 - 17
"Competed on Mar""2017"
"Civil Foundations for 2MW WTG Civil Foundations (25 No's) and Other Infra Works besides Bableswar Village, Near Bijapur City, Bijapur Dist., Karnataka State."
25
Gamesa Renewable Pvt Ltd
Gamesa Renewable Pvt Ltd
17.00
2016-17
"Competed on Mar""2017"
"Land Development Agreement for procurement of 30 WTG (60 MW) locations, alongwith Road, Platforms, Electrical Row and other infra works besides Molagavalli, Near Aluru Town, Kurnool Dist., Andhra Pradesh (Molagavalli Phase I)"
26
WIND POWER PROJECT:
Suzlon Energy
10.00
2016-17
"Competed on April""2017"
"Civil Foundation of 2.10 MW Suzlon Turbine Foundations (25 No's) and other Infrastructure development works near Koukuntla Village, Uravakonda Mandal, Anatapur Dist., AP"
27
WIND POWER PROJECT:
Gamesa Renewable Pvt Ltd
22.00
2016 - 17
"Competed on Mar""2017"
"Land Development, Civil Foundations for 2MW WTG Civil Foundations (30 No's), Roads, Platforms and Other Infra Works besides Sattigeri Village, Yerragatti Town, Belgaum Dist., Karnataka State."
28
WIND POWER PROJECT:
65.00
65.00
2015-17
"Competed on Mar""2017"
"Land Development, Civil Foundations for 2MW WTG Civil Foundations (86 No's), Roads, Platforms and Other Infra Works besides Uravakonda, Anantapur Dist., Andhra Pradesh"

OUR PERFORMANCE IN GREEN ENERGY PROJECTS

#Name of the WorkClient/OwnerContract
Amount
Peroid of
Execution
STATUS
1WIND POWER PROJECT:
Procurement of Land for 19 locations near kustagi, Koppal Dist., KarnatakaSerentica
Renewable Ltd/Suzlon
1900 Lakhs6 monthsWork Under Progress
2WIND POWER PROJECT:
WTG Civil Foundations (Suzlon 3.0/3.15MW-S144_140m_@ 2.375m depth turbine near Kudligi Town, Davangere Dist.,
Karnataka State
Aditya Birla/AS infratech450 Lakhs2 monthsWork Under Progress
3WIND POWER PROJECT:
WTG Civil Foundations (SGRE 3.6 MW turbine & Envision 3.3 Turbine Foundations) alongwith Roads,Crane Platforms near
Kodumuru Town, Kurnool Dist., AP
RCLR Mittal, Greenco EverRenew Energy1950 Lakhs6 monthsWork Under Progress
4WIND POWER PROJECT:
WTG Civil Foundations (GE 2.7MW Foundation) alongwith Roads,Crane Platforms and RMC Supply for 20 Locations near
Sanduru, Bellary Dist., Karnataka State.
JSW Energy Ltd - Sanghavi Movers Ltd900 Lakhs6 monthsWork Under Progress
5WIND POWER PROJECT:
WTG Civil Foundations (GE 2.7MW Foundation) alongwith Roads,Crane Platforms and RMC Supply for 50 Locations near Sanduru, Bellary Dist., Karnataka State.JSW Energy Ltd - Bellari Dist., Karnataka State1200 Lakhs12 monthsWork Under Progress
6WIND POWER PROJECT:
WTG Civil Foundations (GE 2.7MW Foundation) alongwith Roads,Crane Platforms and RMC Supply for 20 Locations near Sanduru, Bellary Dist., Karnataka State.JSW RENEWABLE
ENERGY- B llary Karnataka State
2100 Lakhs12 monthsWork Under Progress
7WIND POWER PROJECT:
Land Procurement for 91 WTG Locations (300 MW) near Gooty, Kurnool Dist., AP StateRenew Power Pvt Ltd - Kurnool Dist., AP State4500 Lakhs12 monthsWork Under Progress
8WIND POWER PROJECT:
Land Procurement for 38 WTG Locations alongwith WTG Civil Foundations for 45 locations, Road, Platforms, ROW and other Infra works near Naregal, Gadag Dits., Karnataka StateAzure Power - Koppal Dist., Karnataka State5500 Lakhs12 monthsWork Under Progress
9WIND POWER PROJECT:
Land Procurement for 54 WTG Locations alongwith ROW for 33KV Line Works, and other Required Works at Kudligi, Davangere Dits., Karnataka StateJSW ENERGY -
Bellari Dist., Karnataka State
2200 Lakhs6 monthsWork Under Progress
10WIND POWER PROJECT:
Land Procurement for 13 WTG Locations alongwith ROW for 33KV Line Works, and other Required Works at Jagaluru,
Davangere Dits., Karnataka State
JSW ENERGY -
Davangere Dist., Karnataka
351 Lakhs2022-23Work Completed on Feb'2023
11WIND POWER PROJECT:
Land Proucrrement for 27 locations along with WTG Civil Foundations, Roads, Platforms and other Required Civil Works at Koppal and Gadag Dist., Karnataka StateRenew Power Pvt Ltd - Karnataka State3750 Lakhs12 MonthsWork Completed on May'2023
12SOLAR PROJECT:
Land Procurement of 360 Acres for Solar Project purpose near Guntakal, Kurnool Dist., APSerentica Renewable Ltd (Sterlite Industries)490 Lakhs2022-23Work Completed on May'2023
13SOLAR PROJECT:
Land Procurement of 350 Acres for Solar Project purpose at Koppal Dist., Karnataka StateSerentica Renewable Energy Ltd (Sterlite
Industries)
550 Lakhs4 monthsWork Completed on Feb'2023
14WIND POWER PROJECT:
Land Procurement for WTG Civil Foundations for 50 MW near Jagaluru Town, Davangere Dist., Karnataka StateSeimens Gamesa Renwable Power Pvt
Ltd
1125 Lakhs2018 - 19Completed on Oct"2019
15WIND POWER PROJECT:
Land Procurement for WTG Civil Foundations and 33kv Electrical lines besides Molagavalli Village, Near Aluru Town, Kurnool Dist., AP (MOLAGAVALLI PROJECT PHASE IV)Seimens Gamesa Renwable Power Pvt Ltd650 Lakhs2018 - 19Completed on Sep'2019
16SOLAR PROJECT:
Civil Works for 50 MW Solar Project, for NTPC near NP Kunta Village, Anantapur Dist., APSterling & Wilson Solar Ltd.,300 Lakhs2019 - 20Completed on May'2019
17SOLAR PROJECT:
Civil Works for 50 MW Solar Project, for NTPC near NP Kunta Village, Anantapur Dist., APGamesa Renewable Pvt Ltd400 Lakhs2019 - 20Completed on May'2019
18WIND POWER PROJECT:
Construction of 33KV line including ROW for 25 WTG (50 MW) locations, besides Molagavalli Village, Near Guntakallu Town, Kurnool Dist., AP State (CIVIL WORKS FOR
MOLAGAVALLI PHASE II & III)
Gamesa Renewable Pvt Ltd850 Lakhs2017-18Completed on Sep" 2018
19WIND POWER PROJECT:
Land Development for 15 No's (50 MW) of WTG Civil Foundations and Other Infra Works besides Molagavalli Village near Aluru Town, Kurnool Dist., AP (LAND DEVELOPMENT FOR MOLAGAVALLI PHASE II & III)Gamesa Renewable Pvt Ltd950 Lakhs2017-18Completed on Sep" 2018
20SOLAR PROJECT:
Civil Works for 30 MW Solar Project, near Kogali Village,
Davangere Dist., Dist., Karnataka State
Gamesa Renewable Pvt
Ltd
1500 Lakhs2017 - 18Completed on
Dec'2018
21SOLAR PROJECT:
Civil Works for 1.40 MW Solar Project, for NTPC Kudgi,
Bijapur Dist., Karnataka State
Gamesa Renewable Pvt
Ltd
175 Lakhs2017 - 18Completed on
Mar'2018
22WIND POWER PROJECT:
Civil Foundations for 2MW WTG Wind Turbines (25 No's) and Other Infra Works besides Bableswar Village, Near Bijapur City, Bijapur Dist., Karnataka State. (BABLESWAR PHASE - II
PROJECT)
Gamesa Renewable Pvt Ltd650 Lakhs2017 - 18Completed on Feb'2018
23WIND POWER PROJECT:
Land Development for 30 No's of WTG Civil Foundations and Other Infra Works besides Itnal Village, Yerragatti Town, Belgaum Dist., Karnataka State. (LAND DEVELOPMENT
FOR SATTIGERI PHASE II)
Gamesa Renewable Pvt Ltd1450 Lakhs2017-18Completed on Feb'2018
24WIND POWER PROJECT:
Civil Foundations for 2MW WTG Civil Foundations (30 No's), Roads, Platforms and Other Infra Works besides Itnal Village, Yerragatti Town, Belgaum Dist., Karnataka State. (CIVIL
WORKS FOR SATTIGERI PHASE II PROJECT)
Gamesa Renewable Pvt Ltd750 Lakhs2017-18Completed on Feb'2018
25WIND POWER PROJECT:
Land Development for 5 No's of WTG Civil Foundations and other Infra Works besides Taralakatti Village and Yelburga
Villages near Koppal Town, Karnataka State
Vestas Wind Technology India Private Limited350 Lakhs2017-18Completed on Mar'2018
26WIND POWER PROJECT:
Civil Foundations for 2 MW WTG Civil Foundations (30 No's), Road, Platforms and Other Infra Works besides Yelburga Village, near Koppal Town, Karnataka StateVestas Wind Technology India Private Limited1650 Lakhs2017-18Completed on Mar'2018
27WIND POWER PROJECT:
Civil Foundations for 3 MW WTG Civil Foundations (21 No's), Platforms and Other Infra Works besides Kanmadi Village, near Bijapur Town, Karnataka StateAcciona Energy2700 Lakhs2016-17Completed on July"2017
28WIND POWER PROJECT:
Civil Foundations for 2 MW WTG Civil Foundations (4 No's) along with Road, Platforms in Hilly Terrain besides Bangakanahalli near Chitradurga Town, Chitradurga Dist., Karnataka StateGamesa Renewable Pvt Ltd110 Lakhs2016-17Competed on Mar"2017
29WIND POWER PROJECT:
Civil Foundations of GE 2.30 MW Turbine WTG Civil Foundations, along with Road, Platforms in Hilly Terrain besides Bangakanahalli near Chitradurga Town, Chitradurga Dist., Karnataka StateAtria Wind Power/AS Infra695 Lakhs2016-17Competed on Mar"2017
30WIND POWER PROJECT:
Civil Foundations of GE 1.70 MW & 2.30 MW Turbine & Vestas 2.00 MW Turbines (19 No's) Civil Foundations, along with Road, Platforms in Hilly Terrain besides Kandi near Badvel Town, Cudappah Dist., Andhra Pradesh StateEcoren Energy India Pvt Ltd1350 Lakhs2016-17Competed on April"2017
31WIND POWER PROJECT:
Civil Foundations for 2MW WTG Civil Foundations (25 No's) and Other Infra Works besides Bableswar Village, Near Bijapur
City, Bijapur Dist., Karnataka State.
Gamesa Renewable Pvt Ltd850 Lakhs2016 - 17Competed on Mar"2017
32WIND POWER PROJECT:
Land Development Agreement for procurement of 30 WTG (60 MW) locations, alongwith Road, Platforms, Electrical Row and other infra works besides Molagavalli, Near Aluru Town, Kurnool Dist., Andhra PradeshGamesa Renewable Pvt Ltd1650 Lakhs2016-17Competed on Mar"2017
33WIND POWER PROJECT:
Civil Foundation of 2.10 MW Suzlon Turbine Foundations (25 No's) and other Infrastructure development works near Koukuntla
Village, Uravakonda Mandal, Anatapur Dist., AP
Suzlon Energy970 Lakhs2016-17Competed on April"2017
34WIND POWER PROJECT:
Land Development Agreement for procurement of 12 WTG (24
MW) locations, besides Sattigeri Village, Near Yerragatti Town, Belgaum Dist., Karnataka State
Gamesa Renewable Pvt Ltd796 Lakhs2016-17Competed on Mar"2017
35WIND POWER PROJECT:
Civil Foundations for 2MW WTG Civil Foundations (30 No's), Roads, Platforms and Other Infra Works besides Sattigeri Village, Yerragatti Town, Belgaum Dist., Karnataka State.Gamesa Renewable Pvt Ltd1225 Lakhs2016 - 17Competed on Mar"2017
36WIND POWER PROJECT:
Civil Foundations for 2MW WTG Civil Foundations (86 No's), Roads, Platforms and Other Infra Works besides Uravakonda,
Anantapur Dist., Andhra Pradesh
Gamesa Renewable Pvt Ltd3520 Lakhs2015-17Competed on Mar"2017
37WIND POWER PROJECT:
Land Development Agreement for procurement of 71 WTG (142 MW) locations near Uravakonda, Anantapur Dist., Andhra
Pradesh
Gamesa Renewable Pvt Ltd2885 Lakhs2015-17Completed on Mar"2017
38WIND POWER PROJECT:
Civil Foundations for 1.60 MW WTG Civil Foundations 15 No's), besides Betamcherla Town near Done Town, Kurnool
Dist., Andhra Pradesh State
Ecoren Energy India Pvt Ltd300 Lakhs2016-17Completed on Sep"2016
39WIND POWER PROJECT:
Formation of Roads, Platforms, Laying of 2.10 MW Suzlon Turbine Foundations and other Infrastructure development works near Zaheerabad Town, Medak District, Telangana StateHero Future Energy Ltd650 Lakhs2015-16Completed on July"2016
40WIND POWER PROJECT:
Construction of 1.8 MW GE WTG Foundations and WTG Substations - 30 No's Besides Raibagh wind farm Phase-II Beside Bykud Village, near RaibaghTown, Belgaum Dist., Karnataka StateBhoruka Powe Corporation Ltd1880 Lakhs2015-16Completed on Mar" 2016
41WIND POWER PROJECT:
Civil Foundations for 2MW WTG - 30 No's, Roads, Platforms
and Other Infra Works Besides Linsugur, Raichur Dist., Karnataka State
Gamesa Wind Turbines Pvt Ltd1200 Lakhs2015-16Completed on Nov" 2015
42WIND POWER PROJECT:
Land Development Agreement for procurement of 30 WTG
locations (60 MW) near Linsugur, Raichur Dist., Karnataka
Gamesa Wind Turbines
Pvt Ltd
1200 Lakhs2015-16Completed on
Oct"2015
43WIND POWER PROJECT:
Construction of WTG Foundations and WTG Substations 25 No's
- Yelisirur wind farm Phase-II Beside Venkatapuram Village, near Gagad Town, Gadag Dist., Karnataka
Bhoruka Powe Corporation Ltd1557.15 Lakhs2014-15Completed on Sep"2015
44WIND POWER PROJECT:
Civil Foundations for 2MW WTG, Roads, Platforms and Other
Infra Works Besides Tuppaldoddi Village, Near Kowtal Village, Raichur Dist., Karnataka
Gamesa Wind Turbines Pvt Ltd850 Lakhs2014-15Completed on March '15
45WIND POWER PROJECT:
Civil Works for WTC Foundation & Subsdtations at Rayabag windfarm, Belgaum Dist, KarnatakaBhoruka Powe Corporation Ltd746.00 Lakhs2013-14Completed
46WIND POWER PROJECT:
Formation of Roads, Platforms, Laying of 1.80 MW Turbine Foundations and other Infrastructure development works besides Komatikuntla Village, near Tadipatri Town, Anantapur District, Andhra PradeshLeitner Sriram Manufacturing Ltd (LSML) and Vaata Infra Pvt Ltd971 Lakhs2012-13Completed
47WIND POWER PROJECT:
Project Approval Fecilitation for Harpanahalli Wind Power Project, (Hara-II) Davangere District, Karnataka StateVestas Wind Technology India
Private Limited
330 Lakhs2012-13Completed
48WIND POWER PROJECT:
Project Approval Fecilitation Agreement for Benekanahalli Wind Power Project, Davangere District, Karnataka StateVestas Wind
Technology India Private Limited
370 Lakhs2011-12Completed
49WIND POWER PROJECT:
Land Procurement for 30 locations of 850KV Turbine Erection near Shiragoan Village, Near Chikkodi Town, Chikkodi Taluq,
Belgaum Dist., Karnataka State
Gamesa Wind Turbines Pvt Ltd450 Lakhs2011-12Completed
50WIND POWER PROJECT:
Formation of Roads, Platforms, Laying of Civil Foundations and other Infrastructure development works near Shiragoan Village, Near Chikkodi Town, Chikkodi Taluq, Belgaum Dist., Karnataka StateGamesa Wind Turbines Pvt Ltd410 Lakhs2011-12Completed
51WIND POWER PROJECT:
Formation of Roads for Mobilization of Machineryfor your Wind Power Project at Bheemasamudra Village, Davangere Dist.,
Karnataka
NSL Renewable Power Pvt Ltd44 Lakhs2010-11Completed
52WIND POWER PROJECT:
Construction Roads for mobilization of Heavy Machinery at Phoolwadi village, TamilnaduNSL Wind Power Company (Phoolwadi)
Pvt Ltd
168 Lakhs2010-11Completed
53WIND POWER PROJECT:
Laying of HT and LT Cable and other Infrastructure development works near Tuppadahalli Villege, Chennagiri Taluq, Davangere
Dist, Karnataka State
Acciona Energy India Pvt Ltd - Elect Systems (ESEPL)55 Lakhs2010-11Completed
54WIND POWER PROJECT:
Formation of Roads and Platforms and other Infrastructure development works near Tuppadahalli Villege, Chennagiri Taluq,
Davangere Dist, Karnataka State
Vestas Wind Technology India Private Limited950 Lakhs2010-11Completed
55WIND POWER PROJECT:
Formation of Roads and Platforms and other Infrastructure development works under Project Hara - I, near Arkanal Tanda Villege, Harapanahalli Taluq, Davangere Dist, Karnataka StateVestas Wind Technology India Private Limited765 Lakhs2010-11Completed
56WIND POWER PROJECT:
Formation of Roads, Platforms and Laying of Foundations work
near Chitradurga, Karnataka State
Chirnjeevi Wind
Energy Ltd (CWEL)
50 Lakhs2010-11Completed
57WIND POWER PROJECT:
Constuction of Roads and other Infrastructure Work near
Nagapatnam, Taminadu State
NSL Renewable Power
Pvt Ltd
280 Lakhs2009-10Completed
58WIND POWER PROJECT:
Formation of Roads and Platforms and other Infrastructure development works near Bhimasamudra Village, Chitradurga
Dist, Karnataka State
Nuziveedu Seeds Limited (NSL)1300 Lakhs2009-10Completed
59WIND POWER PROJECT:
Formation of Roads, and Platforms and other Infrastructure development works near Telagi Village, Davangere Dist.
Karnataka State
Vestas Wind Technology India Private Limited580 Lakhs2008-09Completed
60WIND POWER PROJECT:
Development of Roads, Platforms and other Infrastructure Development works - under project "VAAYU" near Bharmasagara village, Davam gere District and near Anaburu village, Jagalore Taluq, Devanagere Dist.,Vestas Wind Technology India Private Limited400 Lakhs2007-08Completed
61WIND POWER PROJECT:
Construction of Platforms (Phase-II) Hirakandavadi Village,
Chitradurga Dist., Karnataka State
Nuziveedu Seeds
Limited (NSL)
60 Lakhs2007-08Completed
62WIND POWER PROJECT:
Formation of Roads and Platforms and other Infrastructure development works near Chikkodi, Belgaum Dist., Kamataka State and Phase II near Arisanagundi Village, Jagalore Taluq, Davangere Dist., Karnataka StateVestas Wind Technology India Private Limited70 Lakhs2006-07Completed
63WIND POWER PROJECT:
Formation of Roads and Platforms and other infrastructure development work near Arisanagundi Village, Jagalore Taluq,
Davangere Dist., Karnataka State
NEG-Micon India Pvt., Ltd.,216 Lakhs2005-06Completed

SITE GRADING WORKS

s.noProjectClient/OwnerValue of Work in CrPeriodStatus
1Site Grading WorkBVM Energy private limited, Hyderabad1102018-2023Work In Progress (95% completed)
Excvation, Loading and Disposal of Hard Rock by means of controlled balasting and chesiling by mechanical means at Shamshabad, Telangana
2Site Grading, Roads, Culverts, Retailning Wall And Infrastructural Works at Gudipalli IP near Kia Car Project, Anantapur Dist., AAPIIC /Kia Project/ RK Infra Corp622019-2022Work In Progress (99% Completed)
Creation of Internal Infrastructure, like Roads, Storm Water Drains,
Retaining walls, Water Supply
distribution network etc… for KIA ancillary units at APIIC, IP Gudipalli, Ananthapur Dist, Andhra Pradesh
3AP IRRIGATIONAP IRRIGATION DEPT / SSLCC282018-2020Work in Progress (75% Completed)
Execution of Distributory, Major, Minors and sub minors and Construction of CM & CD works on HNSS main Canal Pkg -33 at Uravakonda, Ananthapur Dist,
Andhra Pradesh
4Construction of raising of Ash DykeNTPC Simhadri/SIPL262019-2020Completed
Construction of Raising of Ash Dyke Lagoon -4 at NTPC Simhadri -
VIZAG
5Pile foundation workMata Amritanandamayi Engg Institution, Amaravati City, AP3.892018-2019Completed
Construction of Pile foundations for instutional buildings part-I,at amaravathi campus of Amritha (vishwa Vidyapeetam) university A.P
6SITE GRADING & LAND DEVELOPMENTAscendas Singbridge, Amaravati City, AP41.42018-2019Completed
Site Grading and Land development for Ascendas Singbridge for Welcome Gallery at Amaravathi,
Vijayawda
7SITE GRADING & LAND DEVELOPMENTSRM UNIVERSITY,
Amaravati City, AP
52017-2018Completed
Site grading and construction of BT Road at AMARAVATHI,
ANDHRAPRADESH
8SITE GRADING & LAND DEVELOPMENTAPIIC /L&T/API for Kia Car Project672017-2019Completed
Site Grading work by means of Cutting, Blasting, Breaking, Filling and Leveling (Hard Rock - 13.00 Lakhs Cum) for KIA motors Project Penukonda , Ananthapuram Dist,
Andhra Pradesh
9Construction of raising of Ash DykeNTPC222017 - 18Completed
Civil Works for Third Raising of Ash Dyke (Lagoon III) for Simhadri STPS
Stage - I (2x500MW)
10Construction of raising of Ash DykeNTPC372016-17Completed
Civil Works for Third Raising of Ash
Dyke (Lagoon II) for Simhadri STPS Stage - I (2x500MW)
11SITE GRADING AND HOUSING PROJECTKarnataka Housing Board (KHB), Karnataka652014-2016Completed
Site Grading And Land Development and Construction of Housing
12Construction of raising of Ash DykeNTPC172014-15Completed
Balance work of Lagoon 3&4 (Above
5.5 M and OFL) Ash Dyke Package for Simhadri State-II
13Construction of raising of Ash DykeNTPC252013-14Completed
Balance work of Lagoon 3&4 (Below
5.5 M and OFL) Ash Dyke Package for Simhadri State-II
14NTPC - KEHALGOAN:NTPC13.22013-14Completed
Construction of 4th Raising of Ash Dyke Lagoon-2 at NTPC, Kehalgoan,
Bihar
15Construction of raising of Ash DykeNTPC24.692013-14Completed
Balance Civil works for Starter Dykes
of Stage-2 (Below5.5RL) NTPC, Simhadri,Vizag
16Construction of raising of Ash DykeNTPC9.112013-14Completed
Construction of 2nd raising of Ash
Dyke Lagoon-3C at Kahalgaon
17Construction of raising of Ash DykeNTPC6.52013-14Completed
Construction of IInd Raising of Lagoon-1, Kendua Ash Dyke of
NTPC, Farakka
18Construction of raising of Ash DykeNTPC9.92013-14Completed
1st Raising of Malancha Ash Dyke
Lagoon-2 at NTPC ltd, Farakka
19Construction of raising of Ash DykeNTPC14.862013-14Completed
Construction of 2nd Raising of Ash Dyke Lagoon-3 AB at
KhSTPP,NTPC, Kahalgaon
20Construction of raising of Ash DykeNTPC20.62013-14Completed
Construction of 2nd raising of
Lagoon-1 at NTPC Simhadri, Vizag
21SITE GRADING PROJECTKarnataka Housing Board (KHB),
Karnataka
182011-2013Completed
Proposed Development of Sites and Services work under Suryanagar Phase II near Hinnakki Villege, Anekal Taluq, Bangalore rural Dist.,
Bangalore, Karnataka State
22Site Grading And Land DevelopmentDivyasree NSL Infrastructure-SEZ482009-2013Completed
Site Grading in Hard Rock by control meathods and disposal and basic Infrstructure development at Tech Place , Rayadurgam, Hyderabad

SOME OF OUR WORK EXPERIENCES DURING LAST 5 YEARS

s.noProjectClient/OwnerValue of
Work in Cr
PeriodStatus
1Site Grading Work - Pahse 1 & 2BVM Energy private limited110.002018-2023Work In Progress (90% completed,
Work Enhanced)
Excvation, Loading and Disposal of Hard Rock by
means of controlled balasting and chesiling by mechanical means at
Shamshabad, Telangana
2Pharma Buildings & WarehousesDivis Labouratories
Limited
25.002018-2020Work Completed
Construction of Pharma Structures, RM & Engg Warehouses, SEZ Office, Pipline Bridge, CC Roads & other Infrasturctural Works for SEZ at Choutuppal,
Telangana
3Construction of raising of Ash DykeNTPC Simhadri/SIPL26.002019-2020work in progress
Construction of Raising of Ash Dyke Lagoon -4 at NTPC
Simhadri -VIZAG
4Site Grading, Roads, Culverts, Retailning Wall And Infrastructural
Works
APIIC / RK Infra Corp62.002019-2020work in progress
Creation of Internal Infrastructure, like Roads, Storm Water Drains, Retaining walls, Water Supply
distribution network etc… for KIA ancillary units at APIIC, IP Gudipalli,
Ananthapur Dist, Andhra Pradesh
5AP IRRIGATION CANAL WORKAP IRRIGATION DEPT /
SSLCC
22.002018-2020work in progress
Execution of Distributory, Major, Minors and sub minors and Construction of CM & CD works on HNSS main Canal Pkg -33 at Uravakonda, Ananthapur Dist,
Andhra Pradesh
6WIND POWER PROJECT:Seimens Gamesa
Renwable Power Pvt Ltd
12.002018 - 19Work in Progress
Land Procurement for WTG Civil Foundations for 50 MW near Jagaluru Town, Davangere Dist., Karnataka
State
7Pile foundation workMata Amritanandamayi
Engg Institution
3.892018-2019Completed
Construction of Pile foundations for instutional buildings part-I,at amaravathi campus of Amritha (vishwa
Vidyapeetam) university A.P
8SITE GRADING & LAND
DEVELOPMENT
Ascendas Singbridge41.402018-2019Completed
Site Grading and Land development for Ascendas
Singbridge for Welcome Gallery at
Amaravathi, Vijayawda
9Solar ProjectSimens Gamesa
Renewable Pvt Ltd
6.002017-2018Completed
Civil works for 30 MW Solar project beside Kogali Village, Near Kotturu town , Davuangree Dist,
Karnataka State
10SITE GRADING & LAND
DEVELOPMENT
SRM UNIVERSITY5.002017-2018Completed
Site grading and construction of BT
Road at AMARAVATHI, ANDHRAPRADESH
11SITE GRADING & LAND
DEVELOPMENT
APIIC /L&T/API47.002017-2019Completed
Site Grading work by means of Cutting, Blasting, Breaking, Filling and Leveling (Hard Rock - 13.00 Lakhs Cum) for KIA motors Project Penukonda , Ananthapuram Dist, Andhra Pradesh
12SOLAR PROJECT:Sterling & Wilson Solar
Ltd.,
5.002019 - 20Completed on
May'2019
Civil Works for 50 MW Solar Project,
for NTPC near NP Kunta Village, Anantapur Dist., AP
13SOLAR PROJECT:Gamesa Renewable Pvt
Ltd
4.502019 - 20Completed on
May'2019
Civil Works for 50 MW Solar Project, for NTPC near
NP Kunta Village, Anantapur Dist., AP
14WIND POWER PROJECT:Seimens Gamesa Renwable Power Pvt
Ltd
16.002018 - 19Completed on Dec'2019
Land Procurement for WTG Civil Foundations and 33kv Electrical lines besides Molagavalli Village, Near Aluru Town, Kurnool Dist., AP (Molagavalli Phase II,
III & IV)
15SOLAR PROJECT:Gamesa Renewable Pvt
Ltd
15.002017 - 18Completed on
Dec'2018
Civil Works for 30 MW Solar Project, near Kogali
Village, Davangere Dist., Dist.,
Karnataka State
16SOLAR PROJECT:Gamesa Renewable Pvt
Ltd
2.002017 - 18Completed on
Mar'2018
Civil Works for 1.40 MW Solar Project, for NTPC
Kudgi, Bijapur Dist., Karnataka State
17WIND POWER PROJECT:Gamesa Renewable Pvt
Ltd
7.002017 - 18Completed on
Feb'2018
Civil Foundations for 2MW WTG Wind Turbines (25 No's) and Other Infra Works besides Bableswar Village, Near Bijapur City, Bijapur Dist., Karnataka State. (BABLESWAR PHASE - II PROJECT)
18WIND POWER PROJECT:Gamesa Renewable Pvt
Ltd
24.002017-18Completed on
Feb'2018
Land Development, Civil Foundations for 2MW WTG Civil Foundations (30 No's), Roads, Platforms and Other Infra Works besides Itnal Village, Yerragatti Town, Belgaum Dist., Karnataka State. ( SATTIGERI
PHASE II PROJECT)
19WIND POWER PROJECT:Vestas Wind Technology India Private Limited22.502017-18Completed on Mar'2018
Land Development, Civil Foundations for 2 MW WTG Civil Foundations (30 No's), Road, Platforms and Other Infra Works besides Yelburga Village, near Koppal Town, Karnataka State
20WIND POWER PROJECT:Acciona Energy27.002016-17Completed on
July"2017
Civil Foundations for 3 MW WTG Civil Foundations (21 No's), Platforms and Other Infra Works besides Kanmadi Village, near Bijapur Town, Karnataka
State
21WIND POWER PROJECT:
Civil Foundations for 2 MW WTG Civil Foundations (4 No's) along with Road, Platforms in Hilly Terrain besides Bangakanahalli near Chitradurga Town, Chitradurga Dist., Karnataka StateGamesa Renewable Pvt Ltd1.102016-17Competed on Mar"2017
22WIND POWER PROJECT:Atria Wind Power/AS
Infra
7.002016-17Competed on
Mar"2017
Civil Foundations of GE 2.30 MW Turbine WTG Civil Foundations, along with Road, Platforms in Hilly Terrain besides Bangakanahalli near Chitradurga Town, Chitradurga Dist., Karnataka State
23WIND POWER PROJECT:Ecoren Energy India Pvt
Ltd
16.502016-17Competed on
April"2017
Civil Foundations of GE 1.70 MW &
2.30 MW Turbine & Vestas 2.00 MW Turbines (19 No's) Civil Foundations, along with Road, Platforms in Hilly Terrain besides Kandi near Badvel Town, Cudappah
Dist., Andhra Pradesh State
24WIND POWER PROJECT:Gamesa Renewable Pvt
Ltd
8.52016 - 17Competed on
Mar"2017
Civil Foundations for 2MW WTG Civil Foundations (25 No's) and Other Infra Works besides Bableswar Village, Near Bijapur City, Bijapur Dist., Karnataka State.
25WIND POWER PROJECT:Gamesa Renewable Pvt
Ltd
17.002016-17Competed on
Mar"2017
Land Development Agreement for procurement of 30 WTG (60 MW) locations, alongwith Road, Platforms, Electrical Row and other infra works besides Molagavalli, Near Aluru Town, Kurnool Dist., Andhra
Pradesh (Molagavalli Phase I)
26WIND POWER PROJECT:Suzlon Energy10.002016-17Competed on
April"2017
Civil Foundation of 2.10 MW Suzlon Turbine Foundations (25 No's) and other Infrastructure development works near Koukuntla Village,
Uravakonda Mandal, Anatapur Dist., AP
27WIND POWER PROJECT:Gamesa Renewable Pvt
Ltd
22.002016 - 17Competed on
Mar"2017
Land Development, Civil Foundations for 2MW WTG Civil Foundations (30 No's), Roads, Platforms and Other Infra Works besides Sattigeri Village, Yerragatti
Town, Belgaum Dist., Karnataka State.
28WIND POWER PROJECT:Gamesa Renewable Pvt
Ltd
65.002015-17Competed on
Mar"2017
Land Development, Civil Foundations for 2MW WTG Civil Foundations (86 No's), Roads, Platforms and Other Infra Works besides Uravakonda, Anantapur Dist., Andhra Pradesh
29WIND POWER PROJECT:Ecoren Energy India Pvt
Ltd
3.52016-17Completed on Sep"2017"
Civil Foundations for 1.60 MW WTG
Civil Foundations 15 No's), besides
Betamcherla Town near Done Town,
Kurnool Dist., Andhra Pradesh State
30Site Grading Work - Pahse 1 & 2Hero Future Energy Ltd110.002018-2023Completed july"2016
Formation of Roads, Platforms, Laying of 2.10 MW Suzlon Turbine Foundations and other Infrastructure development works near Zaheerabad Town, Medak
District, Telangana State
31WIND POWER PROJECT:Bhoruka Powe
Corporation Ltd
19.002015-16work compled
Construction of 1.8 MW GE WTG Foundations and WTG Substations - 30 No's Besides Raibagh wind farm Phase- II Beside Bykud Village, near RaibaghTown,
Belgaum Dist., Karnataka State
32WIND POWER PROJECT:Gamesa Wind Turbines Pvt Ltd25.502015-2016Completed
Land Developent, Civil Foundations for 2MW WTG - 30 No's, Roads, Platforms and Other Infra Works
Besides Linsugur, Raichur Dist.,
Karnataka State
33Site Grading And Land Development and HousingKarnataka Housing Board (KHB),
Karnataka
65.002014-2016Completed
Proposed Development of Sites and Services work under Suryanagar Phase III near JigadaVillege, Anekal
Taluq,Bangalore rural Dist.,
34Site Grading And Land DevelopmentKarnataka Housing Board (KHB),
Karnataka
18.002011-2013Completed
Proposed Development of Sites and Services work under Suryanagar Phase II near Hinnakki Villege, Anekal Taluq, Bangalore rural Dist., Bangalore, Karnataka State
35Site Grading And Land DevelopmentDivyasree NSL
Infrastructure-SEZ
48.002009-2013completed
Site Grading in Hard Rock by control meathods and disposal and basic Infrstructure development at Tech Place
, Rayadurgam, Hyderabad

OUR PERFORMANCE

OUR PERFORMANCE
#Name of the WorkClient/OwnerContract AmountPeroid of Execution STATUS
1WIND POWER PROJECT:
Land Procurement and other works for 20 WTG Locations alongwith ROW near Naregal, Gadag Dits., Karnataka StateAzure Power3500 Lakhs6 monthsWork Under
Progres
2WIND POWER PROJECT:
Land Procurement other works for 44 WTG Locations alongwith ROW for 33KV Line Works, and other Required Works at Jagaluru, Davangere Dits., Karnataka StateJSW ENERGY2100 Lakhs8 monthsWork Under
Progress
3WIND POWER PROJECT:
Land Procurement other works for 54 WTG Locations alongwith ROW for 33KV Line Works, and other Required Works at Kudligi, Davangere Dits., Karnataka StateJSW ENERGY2200 Lakhs8 monthsWork Under
Progress
4WIND POWER PROJECT:
Land Proucrrement other works for 27 locations along with WTG Civil Foundations, Roads, Platforms and other Required Civil Works at Koppal and Gadag Dist., Karnataka StateRenew Power Pvt Ltd3800 Lakhs18 MonthsWork Under
Progress
5ROAD WORKS:
Creation of internal infrastructure like Roads, Strom Water Drains, Retaining Wall, Water supply distribution network etc., at IP Gudipalli (V), Somendapalle (M), Ananthapuram District, APAPIIC, Govt of AP6900 Lakhs2019 - 20Work Under
Progress
6LAND GRADING & HARD ROCK EXCAVATION:
Excavation, loading and Disposal of Soils Loose or dence or Hard Rock, Including Structural works Near Tukkuguda, Besides Airport, Hyderabad City, RR Dist, Telengana StateBVM Energy and
Residency Pvt Ltd, Hyderabad
11100 Lakhs2018-20Work Under
Progress
7NTPC - SIMHADRI, VIZAG:
Civil Works for Second Raising of Ash Dyke (Lagoon IV) for Simhadri STPS Stage - I (2x500MW) at Visakhapatnam, APNTPC2600 Lakhs2019 -20Work Under
Progress
8IRRIGATION PROJECT:
HNSS Project – Phase-I – Package No.33 (Balance Work) - Excavation of Balance work in Distributory Majors, Minors, Sub Minors and constructions of CM & CD works on Distributory system and Construction of Balance CM & CD works on HNSS Main Canal in the reach from Km 176.000 to Km 192.000 in Anantapur District, APWater Resources Dept., Govt of AP2500 Lakhs2018 - 20Work Under
Progress
9BUILDING PROJECT FOR DIVIS:
Construction of Industrial Buildings, Roads and other Infra works for Divis Laboratories Ltd., at Unit - 1, Divis Laborotaries, Near Choutuppal, Nalgonda Dist., Telangana State.Divis laboratories Ltd1700 Lakhs2018 -19Completed
10WIND POWER PROJECT:
Land Procurement for WTG Civil Foundations for 50 MW near Jagaluru Town, Davangere Dist., Karnataka StateSeimens Gamesa Renwable Power Pvt Ltd1125 Lakhs2018 - 19Completed on
Aug'21
11WIND POWER PROJECT:
Land Procurement other works for WTG Civil Foundations and 33kv Electrical lines besides Molagavalli Village, Near Aluru Town, Kurnool Dist., AP (MOLAGAVALLI PROJECT PHASE IV)Seimens Gamesa Renwable Power Pvt Ltd650 Lakhs2018 - 19Completed on
Sep'2018
12SOLAR PROJECT:
Civil Works for 50 MW Solar Project, for NTPC near NP Kunta Village, Anantapur Dist., APSterling & Wilson Solar Ltd.,300 Lakhs2019 - 20Completed on
May'2019
13SOLAR PROJECT:
Civil Works for 50 MW Solar Project, for NTPC near NP Kunta Village, Anantapur Dist., APGamesa Renewable Pvt Ltd400 Lakhs2019 - 20Completed on
May'2019
14LAND GRADING WORK:
Land Grading work by cutting, Blasting and filling and levelling, Including Civil Works for KIA CAR PROJECT, near Penugonda town, Anantapur Dist., AP (JV With Associated Project)APIIC - L & T7200 Lakhs2017 - 18Completed on
Mar'2018
15NTPC - SIMHADRI, VIZAG:
Civil Works for Third Raising of Ash Dyke Related Sructural works (Lagoon III) for Simhadri STPS Stage - I (2x500MW)NTPC2200 Lakhs2017 - 18Completed on
Dec'2018
16AWIND POWER PROJECT:
Construction of 33KV line including ROW for 25 WTG (50 MW) locations, besides Molagavalli Village, Near Guntakallu Town, Kurnool Dist., AP State (CIVIL WORKS FOR MOLAGAVALLI PHASE II & III)Gamesa Renewable Pvt Ltd850 Lakhs2017-18Completed on
Sep" 2018
16BWIND POWER PROJECT:
Land Development for 25 No's (50 MW) of WTG Civil Foundations and Other Infra Works besides Molagavalli Village near Aluru Town, Kurnool Dist., AP (LAND DEVELOPMENT FOR MOLAGAVALLI PHASE II & III)Gamesa Renewable Pvt Ltd1550 Lakhs2017-18Completed on
Sep" 2018
17SOLAR PROJECT AND STRUCTURAL:
Civil Works for 30 MW Solar Project, near Kogali Village, Davangere Dist., Dist., Karnataka StateGamesa Renewable Pvt Ltd1500 Lakhs2017 - 18Completed on
Dec'2018
18SOLAR PROJECT AND STRUCTURAL:
Civil Works for 1.40 MW Solar Project, for NTPC Kudgi, Bijapur Dist., Karnataka StateGamesa Renewable Pvt Ltd175 Lakhs2017 - 18Completed on
Mar'2018
19WIND POWER PROJECT:
Civil Foundations for 2MW WTG Wind Turbines (25 No's) and Other Infra Works besides Bableswar Village, Near Bijapur City, Bijapur Dist., Karnataka State. (BABLESWAR PHASE - II PROJECT)Gamesa Renewable Pvt Ltd650 Lakhs2017 - 18Completed on
Feb'2018
20AWIND POWER PROJECT:
Land Development for 30 No's of WTG Civil Foundations and Other Infra Works besides Itnal Village, Yerragatti Town, Belgaum Dist., Karnataka State. (LAND DEVELOPMENT FOR SATTIGERI PHASE II)Gamesa Renewable Pvt Ltd1450 Lakhs2017-18Completed on
Feb'2018
20BWIND POWER PROJECT:
Civil Foundations for 2MW WTG Civil Foundations (30 No's), Roads, Platforms and Other Infra Works besides Itnal Village, Yerragatti Town, Belgaum Dist., Karnataka State. (CIVIL WORKS FOR SATTIGERI PHASE II PROJECT)Gamesa Renewable Pvt Ltd750 Lakhs2017-18Completed on
Feb'2018
21AWIND POWER PROJECT:
Land Development for 5 No's of WTG Civil Foundations and other Infra Works besides Yelburga Village, near Koppal Town, Karnataka StateVestas Wind Technology India Private Limited350 Lakhs2017-18Completed on Mar'2018
21BWIND POWER PROJECT:
Civil Foundations for 2 MW WTG Civil Foundations (30 No's), Road, Platforms and Other Infra Works besides Yelburga Village, near Koppal Town, Karnataka StateVestas Wind Technology India Private Limited1650 Lakhs2017-18Completed on Mar'2018
22NTPC - SIMHADRI, VISAG:
Civil Works for Third Raising of Ash Dyke (Lagoon II) for Simhadri STPS Stage - I (2x500MW)NTPC3700 Lakhs2016-17Completed on Dec"2017
23ROAD WORKS:
Site Levelling and Construction of BT Road at Capital City of AP, Amaravati SRM University500 Lakhs2017-18Completed on August"2017
24WIND POWER PROJECT:
Civil Foundations for 3 MW WTG Civil Foundations (21 No's), Platforms and Other Infra Works besides Kanmadi Village, near Bijapur Town, Karnataka StateAcciona Energy2700 Lakhs2016-17Completed on July"2017
25WIND POWER PROJECT:
Civil Foundations for 2 MW WTG Civil Foundations (4 No's) along with Road, Platforms in Hilly Terrain besides Bangakanahalli near Chitradurga Town, Chitradurga Dist., Karnataka State Gamesa Renewable Pvt Ltd110 Lakhs2016-17Competed on Mar"2017
26WIND POWER PROJECT:
Civil Foundations of GE 2.30 MW Turbine WTG Civil Foundations, along with Road, Platforms in Hilly Terrain besides Bangakanahalli near Chitradurga Town, Chitradurga Dist., Karnataka State Atria Wind Power/AS Infra695 Lakhs2016-17Competed on Mar"2017
27WIND POWER PROJECT:
Civil Foundations of GE 1.70 MW & 2.30 MW Turbine & Vestas 2.00 MW Turbines (19 No's) Civil Foundations, along with Road, Platforms in Hilly Terrain besides Kandi near Badvel Town, Cudappah Dist., Andhra Pradesh State Ecoren Energy India Pvt Ltd1350 Lakhs2016-17Competed on April"2017
28WIND POWER PROJECT:
Civil Foundations for 2MW WTG Civil Foundations (25 No's) and Other Infra Works besides Bableswar Village, Near Bijapur City, Bijapur Dist., Karnataka State.Gamesa Renewable Pvt Ltd850 Lakhs2016 - 17Competed on Mar"2017
29WIND POWER PROJECT:
Land Development Agreement for procurement of 30 WTG (60 MW) locations, alongwith Road, Platforms, Electrical Row and other infra works besides Molagavalli, Near Aluru Town, Kurnool Dist., Andhra PradeshGamesa Renewable Pvt Ltd1650 Lakhs2016-17Competed on Mar"2017
30WIND POWER PROJECT:
Civil Foundation of 2.10 MW Suzlon Turbine Foundations (25 No's) and other Infrastructure development works near Koukuntla Village, Uravakonda Mandal, Anatapur Dist., APSuzlon Energy970 Lakhs2016-17Competed on April"2017
31AWIND POWER PROJECT:
Land Development Agreement for procurement of 12 WTG (24 MW) locations, besides Sattigeri Village, Near Yerragatti Town, Belgaum Dist., Karnataka StateGamesa Renewable Pvt Ltd796 Lakhs2016-17Competed on Mar"2017
31BWIND POWER PROJECT:
Civil Foundations for 2MW WTG Civil Foundations (30 No's), Roads, Platforms and Other Infra Works besides Sattigeri Village, Yerragatti Town, Belgaum Dist., Karnataka State.Gamesa Renewable Pvt Ltd1225 Lakhs2016 - 17Competed on Mar"2017
32AWIND POWER PROJECT:
Civil Foundations for 2MW WTG Civil Foundations (86 No's), Roads, Platforms and Other Infra Works besides Uravakonda, Anantapur Dist., Andhra PradeshGamesa Renewable Pvt Ltd3520 Lakhs2015-17Competed on Mar"2017
32BWIND POWER PROJECT:
Land Development Agreement for procurement of 71 WTG (142 MW) locations near Uravakonda, Anantapur Dist., Andhra PradeshGamesa Renewable Pvt Ltd2885 Lakhs2015-17Completed on Mar"2017
33WIND POWER PROJECT:
Civil Foundations for 1.60 MW WTG Civil Foundations 15 No's), besides Betamcherla Town near Done Town, Kurnool Dist., Andhra Pradesh State Ecoren Energy India Pvt Ltd300 Lakhs2016-17Completed on Sep"2016
34WIND POWER PROJECT:
Formation of Roads, Platforms, Laying of 2.10 MW Suzlon Turbine Foundations and other Infrastructure development works near Zaheerabad Town, Medak District, Telangana StateHero Future Energy Ltd650 Lakhs2015-16Completed on July"2016
35WIND POWER PROJECT:
Construction of 1.8 MW GE WTG Foundations and WTG Substations - 30 No's Besides Raibagh wind farm Phase-II Beside Bykud Village, near RaibaghTown, Belgaum Dist., Karnataka StateBhoruka Powe Corporation Ltd 1880 Lakhs2015-16Completed on Mar" 2016
36AWIND POWER PROJECT:
Civil Foundations for 2MW WTG - 30 No's, Roads, Platforms and Other Infra Works Besides Linsugur, Raichur Dist., Karnataka StateGamesa Wind Turbines Pvt Ltd1200 Lakhs2015-16Completed on Nov" 2015
36BWIND POWER PROJECT:
Land Development Agreement for procurement of 30 WTG locations (60 MW) near Linsugur, Raichur Dist., KarnatakaGamesa Wind Turbines Pvt Ltd1200 Lakhs2015-16Completed on Oct"2015
37WIND POWER PROJECT:
Construction of WTG Foundations and WTG Substations 25 No's - Yelisirur wind farm Phase-II Beside Venkatapuram Village, near Gagad Town, Gadag Dist., KarnatakaBhoruka Powe Corporation Ltd 1557.15 Lakhs2014-15Completed on Sep"2015
38WIND POWER PROJECT:
Civil Foundations for 2MW WTG, Roads, Platforms and Other Infra Works Besides Tuppaldoddi Village, Near Kowtal Village, Raichur Dist., KarnatakaGamesa Wind Turbines Pvt Ltd850 Lakhs2014-15Completed on March '15
39NTPC - VISAG:
Balance work of Lagoon 3&4 (Above 5.5 M and OFL) Ash Dyke Package for Simhadri State-IINTPC Ltd. Vizag1698.99 Lakhs2014-15
40AP IRRIGATION PROJECTS:
Major Irrigation- Modernization of G.W.Delta system- Undi Canal and channel system from Km. 21.192 to Km 54.10 & Km 31.986 to Km 44.562 near PipparaAP Irrigation Department 1897 Lakhs2013-14
41AP IRRIGATION PROJECTS:
Modernisation of Kattelair Anicut Gangadevipadu for Irrigation, ear Kattleru Village,AP Irrigation Department 2085.75 Lakhs2013-14
42NTPC - VISAG:
Balance work of Lagoon 3&4 (Below 5.5 M and OFL) Ash Dyke Package for Simhadri State-IINTPC Ltd. Vizag2469.99 Lakhs2013-14
43NTPC - KEHALGOAN:
Construction of 4th Raising of Ash Dyke Lagoon-2 at NTPC, Kehalgoan, BiharNTPC Ltd.Kahalgaon1361.73 Lakhs2013-14
44NTPC - VISAG:
Balance Civil works for Starter Dykes of Stage-2 (Below5.5RL) NTPC, Simhadri,VizagNTPC Ltd. Vizag2469.00 Lakhs2013-14
45NTPC - KEHALGOAN:
Construction of 2nd raising of Ash Dyke Lagoon-3C at KahalgaonNTPC Ltd. Kahalgaon911.98 Lakhs2013-14
46NTPC - FARAKKA
Construction of IInd Raising of Lagoon-1, Kendua Ash Dyke of NTPC, FarakkaNTPC Ltd. Farakka652.43 Lakhs2013-14
47NTPC - FARAKKA
1st Raising of Malancha Ash Dyke Lagoon-2 at NTPC ltd, FarakkaNTPC Ltd. Farakka946.96 Lakhs2013-14
48NTPC - KEHALGOAN:
Construction of 2nd Raising of Ash Dyke Lagoon-3 AB at KhSTPP,NTPC, KahalgaonNTPC Ltd. Kahalgaon1486.55 Lakhs2013-14
49NTPC - KEHALGOAN:
Construction of 2nd raising of Lagoon-1 at NTPC Simhadri, VizagNTPC ,Simhadri, Vizag2600.00 Lakhs2013-14
50NMDC - Bellari
Civil works of for 723 DHC Conveyor for Downhill Conveyor System of Kumasraswamy Iron Ore Project of NMDC Ltd. – Package II at Donimalai, Bellary Dist., Karnataka StateElecon EPC Projects Ltd.1266.86 Lakhs2013-14
51WIND POWER PROJECT:
Civil Works for WTC Foundation & Subsdtations at Rayabag windfarm, Belgaum Dist, KarnatakaBhoruka Powe Corporation Ltd746.00 Lakhs2013-14
52AP IRRIGATION PROJECTS:
Earth work excation of Link Canal-2 from Dindi Balancing Reservoir to Tuneel-2 inlet from Km.0.000 to Km.1.450 in Nalgonda Dist.A.PAP Irrigation Department 956.40 Lakhs2012-13
53AP IRRIGATION PROJECTS:
Modernisation of Godavari Delta System - Bank Canal and Its Distributory System from 44.800 KM to 58.00 KM near Sidhantam Village, West Godavari District, Andhra PradeshAP Irrigation Dept., Andhra Pradesh1735 Lakhs2012-13
54WIND POWER PROJECT:
Formation of Roads, Platforms, Laying of 1.80 MW Turbine Foundations and other Infrastructure development works besides Komatikuntla Village, near Tadipatri Town, Anantapur District, Andhra Pradesh Leitner Sriram Manufacturing Ltd (LSML) and Vaata Infra Pvt Ltd971 Lakhs2012-13
55WIND POWER PROJECT:
Project Approval Fecilitation for Harpanahalli Wind Power Project, (Hara-II) Davangere District, Karnataka State Vestas Wind Technology India Private Limited330 Lakhs2012-13
56NTPC - KEHALGOAN:
Removal of Overburden works at Wagon Tippler Area at NTPC, KahalgaonNTPC Ltd. Kahalgaon74.19 Lakhs2012-13
57NTPC - KEHALGOAN:
Construction of 3rd Raising of Ash Dyke Lagoon II Work at NTPC-KhSTPP, Kehalgoan, Bihar StateNTPC Ltd., Kahalgoan1416.84 Lakhs2011-12
58WIND POWER PROJECT:
Project Approval Fecilitation Agreement for Benekanahalli Wind Power Project, Davangere District, Karnataka State Vestas Wind Technology India Private Limited370 Lakhs2011-12
59NTPC - KEHALGOAN:
Construction of First Raising of Ash Dyke Lagoon at 3C Work at NTPC, Kehalgoan, Bihar State, through NTPC Limited.NTPC Ltd., Kahalgoan, Bihar State1050 Lakhs2011-12
60KARNATAKA HOUSING BOARD:
Proposed Development of Sites and Services work under Suryanagar Phase III near JigadaVillege, Anekal Taluq, Bangalore rural Dist.,Karnataka Housing Board (KHB), Karnataka4530 Lakhs2011-12
61KARNATAKA HOUSING BOARD:
Proposed Development of Sites and Services work under Suryanagar Phase II (Extention) near Hinnakki Villege, Anekal Taluq, Bangalore rural Dist., Bangalore, Karnataka StateKarnataka Housing Board (KHB), Karnataka120 Lakhs2011-12
62WIND POWER PROJECT:
Formation of Roads, Platforms, Laying of Civil Foundations and other Infrastructure development works near Shiragoan Village, Near Chikkodi Town, Chikkodi Taluq, Belgaum Dist., Karnataka State Gamesa Wind Turbines Pvt Ltd410 Lakhs2011-12
63KARNATAKA HOUSING BOARD:
Construction of Housing under "ASHERE SCHEME" near Ilkal Town, Ilkal Taluq, Bagalkot Dist., Karnataka StateKarnataka Housing Board (KHB), Karnataka675 Lakhs2011-12
64WIND POWER PROJECT:
Formation of Roads for Mobilization of Machineryfor your Wind Power Project at Bheemasamudra Village, Davangere Dist., KarnatakaNSL Renewable Power Pvt Ltd44 Lakhs2010-11
65HYDEL POWER PROJECT:
Construction of Roadway from Rispa Village to Moongual Village, Himachal Pradesh StateNSL Tidong Powr Generation Pvt Ltd450 Lakhs2010-11
66WIND POWER PROJECT:
Construction Roads for mobilization of Heavy Machinery at Phoolwadi village, TamilnaduNSL Wind Power Company (Phoolwadi) Pvt Ltd168 Lakhs2010-11
67NTPC - KEHALGOAN:
Construction of Ist Raising of Ash Dyke Lagoon at 3A and 3B Work at KHSTPP NTPC, Kehalgoan, Bihar StateNTPC Ltd., Kahalgoan, Bihar State1400 Lakhs2010-11
68WIND POWER PROJECT:
Laying of HT and LT Cable and other Infrastructure development works near Tuppadahalli Villege, Chennagiri Taluq, Davangere Dist, Karnataka State Acciona Energy India Pvt Ltd - Elect Systems (ESEPL)55 Lakhs2010-11
69WIND POWER PROJECT:
Formation of Roads and Platforms and other Infrastructure development works near Tuppadahalli Villege, Chennagiri Taluq, Davangere Dist, Karnataka State Vestas Wind Technology India Private Limited950 Lakhs2010-11
70KARNATAKA HOUSING BOARD:
Proposed Development of Sites and Services work and Construction of roads and buildings, under Suryanagar Phase II near Hinnakki Villege, Anekal Taluq, Bangalore rural Dist., Bangalore, Karnataka StateKarnataka Housing Board (KHB), Karnataka1850 Lakhs2010-11
71KARNATAKA HOUSING BOARD:
Construction of Housing under "ASHERE SCHEME" near Ganjyal Villege, Unugondu Taluq, Bagalkot Dist., Karnataka StateKarnataka Housing Board (KHB), Karnataka165 Lakhs2010-11
72WIND POWER PROJECT:
Formation of Roads and Platforms and other Infrastructure development works under Project Hara - I, near Arkanal Tanda Villege, Harapanahalli Taluq, Davangere Dist, Karnataka State Vestas Wind Technology India Private Limited765 Lakhs2010-11
73WIND POWER PROJECT:
Formation of Roads, Platforms and Laying of Foundations work near Chitradurga, Karnataka State Chirnjeevi Wind Energy Ltd (CWEL)50 Lakhs2010-11
74NPCC PROJECT:
Construction of IInd Raising of Ash Dyke Lagoon II Work for NPCC, Kehalgoan, Bihar StateNPCC Limited - Kehalgoan145 Lakhs2009-10
75WIND POWER PROJECT:
Constuction of Roads and other Infrastructure Work near Nagapatnam, Taminadu StateNSL Renewable Power Pvt Ltd280 Lakhs2009-10
76WIND POWER PROJECT:
Formation of Roads and Platforms and other Infrastructure development works near Bhimasamudra Village, Chitradurga Dist, Karnataka StateNuziveedu Seeds Limited (NSL) 1300 Lakhs2009-10
77ROAD WORKS:
Construction of Rural Roads, Bridges and Culverts undeer MP - PMJSY at Bharwani Dist., Madhya Pradesh State.PMJSY - Madhya Pradesh2950 Lakhs2008-11
78NTPC - KEHALGOAN:
Construction of Civil Works in Wagon tippler Complex for Coal Handling systems,NTPC - Kehalgoan1800 Lakhs2008-11
79THERMAL POWR PROJECT AT ANDAL, WEST BENGAL:
Site Grading Work and Civil works @ Coal handling Plant area for Durgapur Steel Thermal Power Corporation near Andal, Burdwan District, West Bengal StateDVC/Thysen Krupp - Coastal Projects1600 Lakhs2008-10
80WIND POWER PROJECT:
Formation of Roads, and Platforms and other Infrastructure development works near Telagi Village, Davangere Dist. Karnataka State Vestas Wind Technology India Private Limited580 Lakhs2008-09
81AP IRRIGATION PROJECTS:
Structural Fabrication Works for Velugonda Tunnel-II Package for Irrigation and CAD Dept at Domal, Prakasam Dist, Through HCC-CPL@ Domal Andhra PradeshAP Irrigation Dept.,750 Lakhs2007-08
82AP IRRIGATION PROJECTS:
Structural Fabrication Works for Velugonda Tunnel-I Package at Domala Prakasam Dist., through SEW, PRASAD, SABIR AND NSC CONSORTIUM., APAP Irrigation Dept.,600 Lakhs2007-08
83AP IRRIGATION PROJECTS:
Pula Subbaiah Velugonda Tunnel - II Package for Irrigation and CAD Dept., , Prakasam Dist., Through HCC-CPL @ Dornala., APAP Irrigation Dept.,1210 Lakhs2007-08
84WIND POWER PROJECT:
Development of Roads, Platforms and other Infrastructure Development works - under project "VAAYU" near Bharmasagara village, Davam gere District and near Anaburu village, Jagalore Taluq, Devanagere Dist.,Vestas Wind Technology India Private Limited400 Lakhs2007-08
85WIND POWER PROJECT:
Construction of Platforms (Phase-II) Hirakandavadi Village, Chitradurga Dist., Karnataka StateNuziveedu Seeds Limited (NSL) 60 Lakhs2007-08
86IT PARK:
Civil works for Divyasree NSL Infrastructure @ Tech Place, Rayadurgam -Site Development Works etc., - Hyderabad.Divyasree/Nuziveedu Seeds Limited (NSL) 4800 Lakhs2006-09
87AP IRRIGATION PROJECTS:
Open Excavation work for construction of Ramp to reach Portal Point at outlet of Srisailam Left Bank Tunnel scheme of ALIMINETI MADHAVA REDDY PROJECT (AMRP) , at Devarakonda, Nalgonda Dist., A.P Coastal Projects Pvt. Ltd.,255 Lakhs2006-07
88AP IRRIGATION PROJECTS:
Pula Subbaiah Velugonda Tunnel - I Project - Package near Domala, Prakasam Dist., Through SEW, PRASAD, SABIR and NSC CONSORTIUM., APAP Irrigation Dept.,1230 Lakhs2006-07
89WIND POWER PROJECT:
Formation of Roads and Platforms and other Infrastructure development works near Chikkodi, Belgaum Dist., Kamataka State and Phase II near Arisanagundi Village, Jagalore Taluq, Davangere Dist., Karnataka State Vestas Wind Technology India Private Limited70 Lakhs2006-07
90AP IRRIGATION PROJECTS:
Execution of High Level Left Main Canal Distribution System under package - 14 of BIMA LIFT IRRIGATION PROJECT, including construction of CMCD WORKS UNDER EPC to feed an ayacut of 35,800 acres, Under Sangambanda Balancing Reservoir -Survey & Execution of work.AP Irrigation Dept.,2500 Lakhs2005-08
91WIND POWER PROJECT:
Formation of Roads and Platforms and other infrastructure development work near Arisanagundi Village, Jagalore Taluq, Davangere Dist., Karnataka State Neg-Micon India Pvt., Ltd., 216 Lakhs2005-06