# | Name of the Work | Client/Owner | Contract Amount | Peroid of Execution | STATUS |
1 | WIND POWER PROJECT: | | | | |
| Land Procurement and other works for 20 WTG Locations alongwith ROW near Naregal, Gadag Dits., Karnataka State | Azure Power | 3500 Lakhs | 6 months | Work Under
Progres |
2 | WIND POWER PROJECT: | | | | |
| Land Procurement other works for 44 WTG Locations alongwith ROW for 33KV Line Works, and other Required Works at Jagaluru, Davangere Dits., Karnataka State | JSW ENERGY | 2100 Lakhs | 8 months | Work Under
Progress |
3 | WIND POWER PROJECT: | | | | |
| Land Procurement other works for 54 WTG Locations alongwith ROW for 33KV Line Works, and other Required Works at Kudligi, Davangere Dits., Karnataka State | JSW ENERGY | 2200 Lakhs | 8 months | Work Under
Progress |
4 | WIND POWER PROJECT: | | | | |
| Land Proucrrement other works for 27 locations along with WTG Civil Foundations, Roads, Platforms and other Required Civil Works at Koppal and Gadag Dist., Karnataka State | Renew Power Pvt Ltd | 3800 Lakhs | 18 Months | Work Under
Progress |
5 | ROAD WORKS: | | | | |
| Creation of internal infrastructure like Roads, Strom Water Drains, Retaining Wall, Water supply distribution network etc., at IP Gudipalli (V), Somendapalle (M), Ananthapuram District, AP | APIIC, Govt of AP | 6900 Lakhs | 2019 - 20 | Work Under
Progress |
6 | LAND GRADING & HARD ROCK EXCAVATION: | | | | |
| Excavation, loading and Disposal of Soils Loose or dence or Hard Rock, Including Structural works Near Tukkuguda, Besides Airport, Hyderabad City, RR Dist, Telengana State | BVM Energy and
Residency Pvt Ltd, Hyderabad | 11100 Lakhs | 2018-20 | Work Under
Progress |
7 | NTPC - SIMHADRI, VIZAG: | | | | |
| Civil Works for Second Raising of Ash Dyke (Lagoon IV) for Simhadri STPS Stage - I (2x500MW) at Visakhapatnam, AP | NTPC | 2600 Lakhs | 2019 -20 | Work Under
Progress |
8 | IRRIGATION PROJECT: | | | | |
| HNSS Project – Phase-I – Package No.33 (Balance Work) - Excavation of Balance work in Distributory Majors, Minors, Sub Minors and constructions of CM & CD works on Distributory system and Construction of Balance CM & CD works on HNSS Main Canal in the reach from Km 176.000 to Km 192.000 in Anantapur District, AP | Water Resources Dept., Govt of AP | 2500 Lakhs | 2018 - 20 | Work Under
Progress |
9 | BUILDING PROJECT FOR DIVIS: | | | | |
| Construction of Industrial Buildings, Roads and other Infra works for Divis Laboratories Ltd., at Unit - 1, Divis Laborotaries, Near Choutuppal, Nalgonda Dist., Telangana State. | Divis laboratories Ltd | 1700 Lakhs | 2018 -19 | Completed |
10 | WIND POWER PROJECT: | | | | |
| Land Procurement for WTG Civil Foundations for 50 MW near Jagaluru Town, Davangere Dist., Karnataka State | Seimens Gamesa Renwable Power Pvt Ltd | 1125 Lakhs | 2018 - 19 | Completed on
Aug'21 |
11 | WIND POWER PROJECT: | | | | |
| Land Procurement other works for WTG Civil Foundations and 33kv Electrical lines besides Molagavalli Village, Near Aluru Town, Kurnool Dist., AP (MOLAGAVALLI PROJECT PHASE IV) | Seimens Gamesa Renwable Power Pvt Ltd | 650 Lakhs | 2018 - 19 | Completed on
Sep'2018 |
12 | SOLAR PROJECT: | | | | |
| Civil Works for 50 MW Solar Project, for NTPC near NP Kunta Village, Anantapur Dist., AP | Sterling & Wilson Solar Ltd., | 300 Lakhs | 2019 - 20 | Completed on
May'2019 |
13 | SOLAR PROJECT: | | | | |
| Civil Works for 50 MW Solar Project, for NTPC near NP Kunta Village, Anantapur Dist., AP | Gamesa Renewable Pvt Ltd | 400 Lakhs | 2019 - 20 | Completed on
May'2019 |
14 | LAND GRADING WORK: | | | | |
| Land Grading work by cutting, Blasting and filling and levelling, Including Civil Works for KIA CAR PROJECT, near Penugonda town, Anantapur Dist., AP (JV With Associated Project) | APIIC - L & T | 7200 Lakhs | 2017 - 18 | Completed on
Mar'2018 |
15 | NTPC - SIMHADRI, VIZAG: | | | | |
| Civil Works for Third Raising of Ash Dyke Related Sructural works (Lagoon III) for Simhadri STPS Stage - I (2x500MW) | NTPC | 2200 Lakhs | 2017 - 18 | Completed on
Dec'2018 |
16A | WIND POWER PROJECT: | | | | |
| Construction of 33KV line including ROW for 25 WTG (50 MW) locations, besides Molagavalli Village, Near Guntakallu Town, Kurnool Dist., AP State (CIVIL WORKS FOR MOLAGAVALLI PHASE II & III) | Gamesa Renewable Pvt Ltd | 850 Lakhs | 2017-18 | Completed on
Sep" 2018 |
16B | WIND POWER PROJECT: | | | | |
| Land Development for 25 No's (50 MW) of WTG Civil Foundations and Other Infra Works besides Molagavalli Village near Aluru Town, Kurnool Dist., AP (LAND DEVELOPMENT FOR MOLAGAVALLI PHASE II & III) | Gamesa Renewable Pvt Ltd | 1550 Lakhs | 2017-18 | Completed on
Sep" 2018 |
17 | SOLAR PROJECT AND STRUCTURAL: | | | | |
| Civil Works for 30 MW Solar Project, near Kogali Village, Davangere Dist., Dist., Karnataka State | Gamesa Renewable Pvt Ltd | 1500 Lakhs | 2017 - 18 | Completed on
Dec'2018 |
18 | SOLAR PROJECT AND STRUCTURAL: | | | | |
| Civil Works for 1.40 MW Solar Project, for NTPC Kudgi, Bijapur Dist., Karnataka State | Gamesa Renewable Pvt Ltd | 175 Lakhs | 2017 - 18 | Completed on
Mar'2018 |
19 | WIND POWER PROJECT: | | | | |
| Civil Foundations for 2MW WTG Wind Turbines (25 No's) and Other Infra Works besides Bableswar Village, Near Bijapur City, Bijapur Dist., Karnataka State. (BABLESWAR PHASE - II PROJECT) | Gamesa Renewable Pvt Ltd | 650 Lakhs | 2017 - 18 | Completed on
Feb'2018 |
20A | WIND POWER PROJECT: | | | | |
| Land Development for 30 No's of WTG Civil Foundations and Other Infra Works besides Itnal Village, Yerragatti Town, Belgaum Dist., Karnataka State. (LAND DEVELOPMENT FOR SATTIGERI PHASE II) | Gamesa Renewable Pvt Ltd | 1450 Lakhs | 2017-18 | Completed on
Feb'2018 |
20B | WIND POWER PROJECT: | | | | |
| Civil Foundations for 2MW WTG Civil Foundations (30 No's), Roads, Platforms and Other Infra Works besides Itnal Village, Yerragatti Town, Belgaum Dist., Karnataka State. (CIVIL WORKS FOR SATTIGERI PHASE II PROJECT) | Gamesa Renewable Pvt Ltd | 750 Lakhs | 2017-18 | Completed on
Feb'2018 |
21A | WIND POWER PROJECT: | | | | |
| Land Development for 5 No's of WTG Civil Foundations and other Infra Works besides Yelburga Village, near Koppal Town, Karnataka State | Vestas Wind Technology India Private Limited | 350 Lakhs | 2017-18 | Completed on Mar'2018 |
21B | WIND POWER PROJECT: | | | | |
| Civil Foundations for 2 MW WTG Civil Foundations (30 No's), Road, Platforms and Other Infra Works besides Yelburga Village, near Koppal Town, Karnataka State | Vestas Wind Technology India Private Limited | 1650 Lakhs | 2017-18 | Completed on Mar'2018 |
22 | NTPC - SIMHADRI, VISAG: | | | | |
| Civil Works for Third Raising of Ash Dyke (Lagoon II) for Simhadri STPS Stage - I (2x500MW) | NTPC | 3700 Lakhs | 2016-17 | Completed on Dec"2017 |
23 | ROAD WORKS: | | | | |
| Site Levelling and Construction of BT Road at Capital City of AP, Amaravati | SRM University | 500 Lakhs | 2017-18 | Completed on August"2017 |
24 | WIND POWER PROJECT: | | | | |
| Civil Foundations for 3 MW WTG Civil Foundations (21 No's), Platforms and Other Infra Works besides Kanmadi Village, near Bijapur Town, Karnataka State | Acciona Energy | 2700 Lakhs | 2016-17 | Completed on July"2017 |
25 | WIND POWER PROJECT: | | | | |
| Civil Foundations for 2 MW WTG Civil Foundations (4 No's) along with Road, Platforms in Hilly Terrain besides Bangakanahalli near Chitradurga Town, Chitradurga Dist., Karnataka State | Gamesa Renewable Pvt Ltd | 110 Lakhs | 2016-17 | Competed on Mar"2017 |
26 | WIND POWER PROJECT: | | | | |
| Civil Foundations of GE 2.30 MW Turbine WTG Civil Foundations, along with Road, Platforms in Hilly Terrain besides Bangakanahalli near Chitradurga Town, Chitradurga Dist., Karnataka State | Atria Wind Power/AS Infra | 695 Lakhs | 2016-17 | Competed on Mar"2017 |
27 | WIND POWER PROJECT: | | | | |
| Civil Foundations of GE 1.70 MW & 2.30 MW Turbine & Vestas 2.00 MW Turbines (19 No's) Civil Foundations, along with Road, Platforms in Hilly Terrain besides Kandi near Badvel Town, Cudappah Dist., Andhra Pradesh State | Ecoren Energy India Pvt Ltd | 1350 Lakhs | 2016-17 | Competed on April"2017 |
28 | WIND POWER PROJECT: | | | | |
| Civil Foundations for 2MW WTG Civil Foundations (25 No's) and Other Infra Works besides Bableswar Village, Near Bijapur City, Bijapur Dist., Karnataka State. | Gamesa Renewable Pvt Ltd | 850 Lakhs | 2016 - 17 | Competed on Mar"2017 |
29 | WIND POWER PROJECT: | | | | |
| Land Development Agreement for procurement of 30 WTG (60 MW) locations, alongwith Road, Platforms, Electrical Row and other infra works besides Molagavalli, Near Aluru Town, Kurnool Dist., Andhra Pradesh | Gamesa Renewable Pvt Ltd | 1650 Lakhs | 2016-17 | Competed on Mar"2017 |
30 | WIND POWER PROJECT: | | | | |
| Civil Foundation of 2.10 MW Suzlon Turbine Foundations (25 No's) and other Infrastructure development works near Koukuntla Village, Uravakonda Mandal, Anatapur Dist., AP | Suzlon Energy | 970 Lakhs | 2016-17 | Competed on April"2017 |
31A | WIND POWER PROJECT: | | | | |
| Land Development Agreement for procurement of 12 WTG (24 MW) locations, besides Sattigeri Village, Near Yerragatti Town, Belgaum Dist., Karnataka State | Gamesa Renewable Pvt Ltd | 796 Lakhs | 2016-17 | Competed on Mar"2017 |
31B | WIND POWER PROJECT: | | | | |
| Civil Foundations for 2MW WTG Civil Foundations (30 No's), Roads, Platforms and Other Infra Works besides Sattigeri Village, Yerragatti Town, Belgaum Dist., Karnataka State. | Gamesa Renewable Pvt Ltd | 1225 Lakhs | 2016 - 17 | Competed on Mar"2017 |
32A | WIND POWER PROJECT: | | | | |
| Civil Foundations for 2MW WTG Civil Foundations (86 No's), Roads, Platforms and Other Infra Works besides Uravakonda, Anantapur Dist., Andhra Pradesh | Gamesa Renewable Pvt Ltd | 3520 Lakhs | 2015-17 | Competed on Mar"2017 |
32B | WIND POWER PROJECT: | | | | |
| Land Development Agreement for procurement of 71 WTG (142 MW) locations near Uravakonda, Anantapur Dist., Andhra Pradesh | Gamesa Renewable Pvt Ltd | 2885 Lakhs | 2015-17 | Completed on Mar"2017 |
33 | WIND POWER PROJECT: | | | | |
| Civil Foundations for 1.60 MW WTG Civil Foundations 15 No's), besides Betamcherla Town near Done Town, Kurnool Dist., Andhra Pradesh State | Ecoren Energy India Pvt Ltd | 300 Lakhs | 2016-17 | Completed on Sep"2016 |
34 | WIND POWER PROJECT: | | | | |
| Formation of Roads, Platforms, Laying of 2.10 MW Suzlon Turbine Foundations and other Infrastructure development works near Zaheerabad Town, Medak District, Telangana State | Hero Future Energy Ltd | 650 Lakhs | 2015-16 | Completed on July"2016 |
35 | WIND POWER PROJECT: | | | | |
| Construction of 1.8 MW GE WTG Foundations and WTG Substations - 30 No's Besides Raibagh wind farm Phase-II Beside Bykud Village, near RaibaghTown, Belgaum Dist., Karnataka State | Bhoruka Powe Corporation Ltd | 1880 Lakhs | 2015-16 | Completed on Mar" 2016 |
36A | WIND POWER PROJECT: | | | | |
| Civil Foundations for 2MW WTG - 30 No's, Roads, Platforms and Other Infra Works Besides Linsugur, Raichur Dist., Karnataka State | Gamesa Wind Turbines Pvt Ltd | 1200 Lakhs | 2015-16 | Completed on Nov" 2015 |
36B | WIND POWER PROJECT: | | | | |
| Land Development Agreement for procurement of 30 WTG locations (60 MW) near Linsugur, Raichur Dist., Karnataka | Gamesa Wind Turbines Pvt Ltd | 1200 Lakhs | 2015-16 | Completed on Oct"2015 |
37 | WIND POWER PROJECT: | | | | |
| Construction of WTG Foundations and WTG Substations 25 No's - Yelisirur wind farm Phase-II Beside Venkatapuram Village, near Gagad Town, Gadag Dist., Karnataka | Bhoruka Powe Corporation Ltd | 1557.15 Lakhs | 2014-15 | Completed on Sep"2015 |
38 | WIND POWER PROJECT: | | | | |
| Civil Foundations for 2MW WTG, Roads, Platforms and Other Infra Works Besides Tuppaldoddi Village, Near Kowtal Village, Raichur Dist., Karnataka | Gamesa Wind Turbines Pvt Ltd | 850 Lakhs | 2014-15 | Completed on March '15 |
39 | NTPC - VISAG: | | | | |
| Balance work of Lagoon 3&4 (Above 5.5 M and OFL) Ash Dyke Package for Simhadri State-II | NTPC Ltd. Vizag | 1698.99 Lakhs | 2014-15 | |
40 | AP IRRIGATION PROJECTS: | | | | |
| Major Irrigation- Modernization of G.W.Delta system- Undi Canal and channel system from Km. 21.192 to Km 54.10 & Km 31.986 to Km 44.562 near Pippara | AP Irrigation Department | 1897 Lakhs | 2013-14 | |
41 | AP IRRIGATION PROJECTS: | | | | |
| Modernisation of Kattelair Anicut Gangadevipadu for Irrigation, ear Kattleru Village, | AP Irrigation Department | 2085.75 Lakhs | 2013-14 | |
42 | NTPC - VISAG: | | | | |
| Balance work of Lagoon 3&4 (Below 5.5 M and OFL) Ash Dyke Package for Simhadri State-II | NTPC Ltd. Vizag | 2469.99 Lakhs | 2013-14 | |
43 | NTPC - KEHALGOAN: | | | | |
| Construction of 4th Raising of Ash Dyke Lagoon-2 at NTPC, Kehalgoan, Bihar | NTPC Ltd.Kahalgaon | 1361.73 Lakhs | 2013-14 | |
44 | NTPC - VISAG: | | | | |
| Balance Civil works for Starter Dykes of Stage-2 (Below5.5RL) NTPC, Simhadri,Vizag | NTPC Ltd. Vizag | 2469.00 Lakhs | 2013-14 | |
45 | NTPC - KEHALGOAN: | | | | |
| Construction of 2nd raising of Ash Dyke Lagoon-3C at Kahalgaon | NTPC Ltd. Kahalgaon | 911.98 Lakhs | 2013-14 | |
46 | NTPC - FARAKKA | | | | |
| Construction of IInd Raising of Lagoon-1, Kendua Ash Dyke of NTPC, Farakka | NTPC Ltd. Farakka | 652.43 Lakhs | 2013-14 | |
47 | NTPC - FARAKKA | | | | |
| 1st Raising of Malancha Ash Dyke Lagoon-2 at NTPC ltd, Farakka | NTPC Ltd. Farakka | 946.96 Lakhs | 2013-14 | |
48 | NTPC - KEHALGOAN: | | | | |
| Construction of 2nd Raising of Ash Dyke Lagoon-3 AB at KhSTPP,NTPC, Kahalgaon | NTPC Ltd. Kahalgaon | 1486.55 Lakhs | 2013-14 | |
49 | NTPC - KEHALGOAN: | | | | |
| Construction of 2nd raising of Lagoon-1 at NTPC Simhadri, Vizag | NTPC ,Simhadri, Vizag | 2600.00 Lakhs | 2013-14 | |
50 | NMDC - Bellari | | | | |
| Civil works of for 723 DHC Conveyor for Downhill Conveyor System of Kumasraswamy Iron Ore Project of NMDC Ltd. – Package II at Donimalai, Bellary Dist., Karnataka State | Elecon EPC Projects Ltd. | 1266.86 Lakhs | 2013-14 | |
51 | WIND POWER PROJECT: | | | | |
| Civil Works for WTC Foundation & Subsdtations at Rayabag windfarm, Belgaum Dist, Karnataka | Bhoruka Powe Corporation Ltd | 746.00 Lakhs | 2013-14 | |
52 | AP IRRIGATION PROJECTS: | | | | |
| Earth work excation of Link Canal-2 from Dindi Balancing Reservoir to Tuneel-2 inlet from Km.0.000 to Km.1.450 in Nalgonda Dist.A.P | AP Irrigation Department | 956.40 Lakhs | 2012-13 | |
53 | AP IRRIGATION PROJECTS: | | | | |
| Modernisation of Godavari Delta System - Bank Canal and Its Distributory System from 44.800 KM to 58.00 KM near Sidhantam Village, West Godavari District, Andhra Pradesh | AP Irrigation Dept., Andhra Pradesh | 1735 Lakhs | 2012-13 | |
54 | WIND POWER PROJECT: | | | | |
| Formation of Roads, Platforms, Laying of 1.80 MW Turbine Foundations and other Infrastructure development works besides Komatikuntla Village, near Tadipatri Town, Anantapur District, Andhra Pradesh | Leitner Sriram Manufacturing Ltd (LSML) and Vaata Infra Pvt Ltd | 971 Lakhs | 2012-13 | |
55 | WIND POWER PROJECT: | | | | |
| Project Approval Fecilitation for Harpanahalli Wind Power Project, (Hara-II) Davangere District, Karnataka State | Vestas Wind Technology India Private Limited | 330 Lakhs | 2012-13 | |
56 | NTPC - KEHALGOAN: | | | | |
| Removal of Overburden works at Wagon Tippler Area at NTPC, Kahalgaon | NTPC Ltd. Kahalgaon | 74.19 Lakhs | 2012-13 | |
57 | NTPC - KEHALGOAN: | | | | |
| Construction of 3rd Raising of Ash Dyke Lagoon II Work at NTPC-KhSTPP, Kehalgoan, Bihar State | NTPC Ltd., Kahalgoan | 1416.84 Lakhs | 2011-12 | |
58 | WIND POWER PROJECT: | | | | |
| Project Approval Fecilitation Agreement for Benekanahalli Wind Power Project, Davangere District, Karnataka State | Vestas Wind Technology India Private Limited | 370 Lakhs | 2011-12 | |
59 | NTPC - KEHALGOAN: | | | | |
| Construction of First Raising of Ash Dyke Lagoon at 3C Work at NTPC, Kehalgoan, Bihar State, through NTPC Limited. | NTPC Ltd., Kahalgoan, Bihar State | 1050 Lakhs | 2011-12 | |
60 | KARNATAKA HOUSING BOARD: | | | | |
| Proposed Development of Sites and Services work under Suryanagar Phase III near JigadaVillege, Anekal Taluq, Bangalore rural Dist., | Karnataka Housing Board (KHB), Karnataka | 4530 Lakhs | 2011-12 | |
61 | KARNATAKA HOUSING BOARD: | | | | |
| Proposed Development of Sites and Services work under Suryanagar Phase II (Extention) near Hinnakki Villege, Anekal Taluq, Bangalore rural Dist., Bangalore, Karnataka State | Karnataka Housing Board (KHB), Karnataka | 120 Lakhs | 2011-12 | |
62 | WIND POWER PROJECT: | | | | |
| Formation of Roads, Platforms, Laying of Civil Foundations and other Infrastructure development works near Shiragoan Village, Near Chikkodi Town, Chikkodi Taluq, Belgaum Dist., Karnataka State | Gamesa Wind Turbines Pvt Ltd | 410 Lakhs | 2011-12 | |
63 | KARNATAKA HOUSING BOARD: | | | | |
| Construction of Housing under "ASHERE SCHEME" near Ilkal Town, Ilkal Taluq, Bagalkot Dist., Karnataka State | Karnataka Housing Board (KHB), Karnataka | 675 Lakhs | 2011-12 | |
64 | WIND POWER PROJECT: | | | | |
| Formation of Roads for Mobilization of Machineryfor your Wind Power Project at Bheemasamudra Village, Davangere Dist., Karnataka | NSL Renewable Power Pvt Ltd | 44 Lakhs | 2010-11 | |
65 | HYDEL POWER PROJECT: | | | | |
| Construction of Roadway from Rispa Village to Moongual Village, Himachal Pradesh State | NSL Tidong Powr Generation Pvt Ltd | 450 Lakhs | 2010-11 | |
66 | WIND POWER PROJECT: | | | | |
| Construction Roads for mobilization of Heavy Machinery at Phoolwadi village, Tamilnadu | NSL Wind Power Company (Phoolwadi) Pvt Ltd | 168 Lakhs | 2010-11 | |
67 | NTPC - KEHALGOAN: | | | | |
| Construction of Ist Raising of Ash Dyke Lagoon at 3A and 3B Work at KHSTPP NTPC, Kehalgoan, Bihar State | NTPC Ltd., Kahalgoan, Bihar State | 1400 Lakhs | 2010-11 | |
68 | WIND POWER PROJECT: | | | | |
| Laying of HT and LT Cable and other Infrastructure development works near Tuppadahalli Villege, Chennagiri Taluq, Davangere Dist, Karnataka State | Acciona Energy India Pvt Ltd - Elect Systems (ESEPL) | 55 Lakhs | 2010-11 | |
69 | WIND POWER PROJECT: | | | | |
| Formation of Roads and Platforms and other Infrastructure development works near Tuppadahalli Villege, Chennagiri Taluq, Davangere Dist, Karnataka State | Vestas Wind Technology India Private Limited | 950 Lakhs | 2010-11 | |
70 | KARNATAKA HOUSING BOARD: | | | | |
| Proposed Development of Sites and Services work and Construction of roads and buildings, under Suryanagar Phase II near Hinnakki Villege, Anekal Taluq, Bangalore rural Dist., Bangalore, Karnataka State | Karnataka Housing Board (KHB), Karnataka | 1850 Lakhs | 2010-11 | |
71 | KARNATAKA HOUSING BOARD: | | | | |
| Construction of Housing under "ASHERE SCHEME" near Ganjyal Villege, Unugondu Taluq, Bagalkot Dist., Karnataka State | Karnataka Housing Board (KHB), Karnataka | 165 Lakhs | 2010-11 | |
72 | WIND POWER PROJECT: | | | | |
| Formation of Roads and Platforms and other Infrastructure development works under Project Hara - I, near Arkanal Tanda Villege, Harapanahalli Taluq, Davangere Dist, Karnataka State | Vestas Wind Technology India Private Limited | 765 Lakhs | 2010-11 | |
73 | WIND POWER PROJECT: | | | | |
| Formation of Roads, Platforms and Laying of Foundations work near Chitradurga, Karnataka State | Chirnjeevi Wind Energy Ltd (CWEL) | 50 Lakhs | 2010-11 | |
74 | NPCC PROJECT: | | | | |
| Construction of IInd Raising of Ash Dyke Lagoon II Work for NPCC, Kehalgoan, Bihar State | NPCC Limited - Kehalgoan | 145 Lakhs | 2009-10 | |
75 | WIND POWER PROJECT: | | | | |
| Constuction of Roads and other Infrastructure Work near Nagapatnam, Taminadu State | NSL Renewable Power Pvt Ltd | 280 Lakhs | 2009-10 | |
76 | WIND POWER PROJECT: | | | | |
| Formation of Roads and Platforms and other Infrastructure development works near Bhimasamudra Village, Chitradurga Dist, Karnataka State | Nuziveedu Seeds Limited (NSL) | 1300 Lakhs | 2009-10 | |
77 | ROAD WORKS: | | | | |
| Construction of Rural Roads, Bridges and Culverts undeer MP - PMJSY at Bharwani Dist., Madhya Pradesh State. | PMJSY - Madhya Pradesh | 2950 Lakhs | 2008-11 | |
78 | NTPC - KEHALGOAN: | | | | |
| Construction of Civil Works in Wagon tippler Complex for Coal Handling systems, | NTPC - Kehalgoan | 1800 Lakhs | 2008-11 | |
79 | THERMAL POWR PROJECT AT ANDAL, WEST BENGAL: | | | | |
| Site Grading Work and Civil works @ Coal handling Plant area for Durgapur Steel Thermal Power Corporation near Andal, Burdwan District, West Bengal State | DVC/Thysen Krupp - Coastal Projects | 1600 Lakhs | 2008-10 | |
80 | WIND POWER PROJECT: | | | | |
| Formation of Roads, and Platforms and other Infrastructure development works near Telagi Village, Davangere Dist. Karnataka State | Vestas Wind Technology India Private Limited | 580 Lakhs | 2008-09 | |
81 | AP IRRIGATION PROJECTS: | | | | |
| Structural Fabrication Works for Velugonda Tunnel-II Package for Irrigation and CAD Dept at Domal, Prakasam Dist, Through HCC-CPL@ Domal Andhra Pradesh | AP Irrigation Dept., | 750 Lakhs | 2007-08 | |
82 | AP IRRIGATION PROJECTS: | | | | |
| Structural Fabrication Works for Velugonda Tunnel-I Package at Domala Prakasam Dist., through SEW, PRASAD, SABIR AND NSC CONSORTIUM., AP | AP Irrigation Dept., | 600 Lakhs | 2007-08 | |
83 | AP IRRIGATION PROJECTS: | | | | |
| Pula Subbaiah Velugonda Tunnel - II Package for Irrigation and CAD Dept., , Prakasam Dist., Through HCC-CPL @ Dornala., AP | AP Irrigation Dept., | 1210 Lakhs | 2007-08 | |
84 | WIND POWER PROJECT: | | | | |
| Development of Roads, Platforms and other Infrastructure Development works - under project "VAAYU" near Bharmasagara village, Davam gere District and near Anaburu village, Jagalore Taluq, Devanagere Dist., | Vestas Wind Technology India Private Limited | 400 Lakhs | 2007-08 | |
85 | WIND POWER PROJECT: | | | | |
| Construction of Platforms (Phase-II) Hirakandavadi Village, Chitradurga Dist., Karnataka State | Nuziveedu Seeds Limited (NSL) | 60 Lakhs | 2007-08 | |
86 | IT PARK: | | | | |
| Civil works for Divyasree NSL Infrastructure @ Tech Place, Rayadurgam -Site Development Works etc., - Hyderabad. | Divyasree/Nuziveedu Seeds Limited (NSL) | 4800 Lakhs | 2006-09 | |
87 | AP IRRIGATION PROJECTS: | | | | |
| Open Excavation work for construction of Ramp to reach Portal Point at outlet of Srisailam Left Bank Tunnel scheme of ALIMINETI MADHAVA REDDY PROJECT (AMRP) , at Devarakonda, Nalgonda Dist., A.P | Coastal Projects Pvt. Ltd., | 255 Lakhs | 2006-07 | |
88 | AP IRRIGATION PROJECTS: | | | | |
| Pula Subbaiah Velugonda Tunnel - I Project - Package near Domala, Prakasam Dist., Through SEW, PRASAD, SABIR and NSC CONSORTIUM., AP | AP Irrigation Dept., | 1230 Lakhs | 2006-07 | |
89 | WIND POWER PROJECT: | | | | |
| Formation of Roads and Platforms and other Infrastructure development works near Chikkodi, Belgaum Dist., Kamataka State and Phase II near Arisanagundi Village, Jagalore Taluq, Davangere Dist., Karnataka State | Vestas Wind Technology India Private Limited | 70 Lakhs | 2006-07 | |
90 | AP IRRIGATION PROJECTS: | | | | |
| Execution of High Level Left Main Canal Distribution System under package - 14 of BIMA LIFT IRRIGATION PROJECT, including construction of CMCD WORKS UNDER EPC to feed an ayacut of 35,800 acres, Under Sangambanda Balancing Reservoir -Survey & Execution of work. | AP Irrigation Dept., | 2500 Lakhs | 2005-08 | |
91 | WIND POWER PROJECT: | | | | |
| Formation of Roads and Platforms and other infrastructure development work near Arisanagundi Village, Jagalore Taluq, Davangere Dist., Karnataka State | Neg-Micon India Pvt., Ltd., | 216 Lakhs | 2005-06 | |